MMC ELECTRIC INC

How many solar installs has MMC ELECTRIC INC done in California, and which license number is on its installs?

MMC ELECTRIC INC has 525 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jul 30, 2024 to Aug 31, 2026), most of them in Kern County (159), San Bernardino County (85) and Fresno County (64). CSLB lists license 1108848 (MMC ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
525
Last 24 months
522
Total capacity
3,948.5 kW DC
Median system size
7 kW DC
With battery storage
98.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
50.5% of 525 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
513 installs, latest Aug 31, 2026
Ownership types recorded
PPA 237, other 28
Median battery size
13.5 kWh (352 installs list a capacity)
First install
Jul 30, 2024
Latest install
Aug 31, 2026
Counties
30
Utilities
PGE 264, SCE 258, SDGE 3
CSLB license
1108848

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241313
2025215208
2026 (through Aug 31, 2026)297292

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

513 of its 525 interconnected installs (97.7% of the 525 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.2% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.2%not counted
NEM 2.0112.1%6 (54.5%)
Net Billing Tariff51397.7%506 (99.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 265 of MMC ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 237, lease 0, prepaid lease 0, other 28. No residential system in the file lists a third-party owner name that matches MMC ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Palmetto LightReach132
Goodleap108
Sunrun6
Lightreach4
Palmetto Solar LLC4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 521 of MMC ELECTRIC INC’s 522 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (152, 29.2%) used modules recorded as Qcells.

In the last 24 months, 522 of MMC ELECTRIC INC’s 522 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (283, 54.2%) used inverters recorded as Tesla.

In the last 24 months, 486 of MMC ELECTRIC INC’s 522 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (266, 54.7%) used batteries recorded as Tesla.

489 of 513 battery-paired PG&E and SCE installs (95.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells152152
Mission Solar139139
JinkoSolar5758
Trina Solar5555
VSUN (Vietnam Sunergy)5252
Inverter makerTesla283284
Enphase262265
SolarEdge1616
Qcells22
Schneider Electric22
Battery makerTesla266267
Enphase218220
SolarEdge22
Energy Storage System11
Schneider Electric11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 524 of 525 installs, inverters on 525. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MMC ELECTRIC INC as developer on 11 battery storage projects and as installer on 11 (11 name it as both), 11 projects in all with 213 kWh of storage. 1 have the status Paid, with $24,158 in current incentive allocations. Applications were received from Jun 10, 2025 to Jan 16, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$24,158
Pending Reservation379$88,786
Waitlist688$182,477
Cancelled126$30,075

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU11213$325,4971$24,158

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1108848MMC ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorAug 16, 2023Aug 31, 2027525

License numbers are the ones the utilities recorded on the interconnection applications (525 of 525 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1108848. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list MMC ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
unincorporated San Diego County1108848112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Kern159
San Bernardino85
Fresno64
Inyo47
Tulare40
Los Angeles33
Riverside28
Kings15
Madera8
Santa Clara6
Ventura6
Merced5
San Joaquin5
Orange3
Solano3
Sonoma3
San Diego2
Alameda1
Contra Costa1
Marin1
Mono1
Monterey1
Plumas1
San Benito1
San Luis Obispo1
San Mateo1
Shasta1
Stanislaus1
Yolo1
Yuba1

Top cities

CityInstalls
Bakersfield128
Bishop44
Fresno41
San Bernardino19
Hesperia18
Lancaster13
Victorville13
Porterville9
Adelanto8
Hanford8
Visalia8
Clovis7
Delano7
Moreno Valley7
Palmdale7

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MMC ELECTRIC INC521
MMC Electric Inc3
MMC-ELECTRIC-INC1

Common questions

Where does MMC ELECTRIC INC install solar?

Its installs are spread across 30 counties. The most are in Kern County (159 installs), followed by San Bernardino County (85).

How often does MMC ELECTRIC INC install batteries with solar?

98.3% of its interconnected solar installs include battery storage across all years, and 98.3% in the last 24 months (510 of 519). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many MMC ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

513 of its 525 interconnected installs (97.7% of the 525 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.2% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.