Global Solar Electric

How many solar installs has Global Solar Electric done in California, and which license number is on its installs?

Global Solar Electric has 168 residential solar installs interconnected in California, active in the records from 2019 through 2026 (May 7, 2019 to Jul 2, 2026), most of them in San Diego County (166), Orange County (1) and Riverside County (1). The license number recorded on most of its installs, 1053939, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 988444 (GLOBAL HEATING & AIR CONDITIONING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, expires Feb 28, 2027, recorded on 16 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Global Solar Electric here carry more than one CSLB license number: 1053939 on 151 (not found in the CSLB License Master file) and 988444 on 16 (CSLB holder GLOBAL HEATING & AIR CONDITIONING INC, El Cajon), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
168
Last 24 months
29
Total capacity
1,313.1 kW DC
Median system size
7.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
1.2% of 168 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
32 installs, latest Jul 2, 2026
Ownership types recorded
PPA 2
First install
May 7, 2019
Latest install
Jul 2, 2026
Counties
3
Utilities
SDGE 167, SCE 1
CSLB license
1053939, 988444

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201990
2020180
2021200
2022360
2023500
202470
2025200
2026 (through Aug 31, 2026)80

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

32 of its 168 interconnected installs (19.0% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.013681.0%0 (0.0%)
Net Billing Tariff3219.0%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of Global Solar Electric’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Global Solar Electric exactly.

Third-party owner named on its installsInstalls
Sal2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of Global Solar Electric’s 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 74.1%) used modules recorded as Qcells.

In the last 24 months, 29 of Global Solar Electric’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 96.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2079
Hyundai3not in top list
AMPSSolar1not in top list
Aptos Solar1not in top list
LONGi1not in top list
Inverter makerEnphase28138
SunPower18
Tesla1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 159 of 168 installs, inverters on 168. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1053939Not found in the CSLB License Master file pulled Nov 4, 2026151
988444GLOBAL HEATING & AIR CONDITIONING INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorNov 14, 2013Feb 28, 202716

License numbers are the ones the utilities recorded on the interconnection applications (167 of 168 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988444. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Global Solar Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201920202021202220232024Total
unincorporated San Diego County10539393361421451

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego166
Orange1
Riverside1

Top cities

CityInstalls
El Cajon75
San Diego49
La Mesa10
Spring Valley6
Carlsbad4
Chula Vista3
Jamul3
Poway3
Santee3
Escondido2
Lakeside2
Bonita1
Coronado1
Lemon Grove1
Oceanside1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Global Solar Electric167
GLOBAL SOLAR ELECTRIC1

Common questions

Where does Global Solar Electric install solar?

Its installs are spread across 3 counties. The most are in San Diego County (166 installs), followed by Orange County (1).

How often does Global Solar Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Global Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

32 of its 168 interconnected installs (19.0% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.