GRID Alternatives North Valley, Inc.

How many solar installs has GRID Alternatives North Valley, Inc. done in California, and which license number is on its installs?

GRID Alternatives North Valley, Inc. has 291 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Jan 30, 2015 to Jul 31, 2024), most of them in San Joaquin County (110), Glenn County (38) and Butte County (32). CSLB lists license 867533 (GRID ALTERNATIVES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
291
Last 24 months
0
Total capacity
1,243.3 kW DC
Median system size
4.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
96.2% of 291 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 280
First install
Jan 30, 2015
Latest install
Jul 31, 2024
Counties
11
Utilities
PGE 291
CSLB license
867533

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201530
201600
201700
20181360
20191470
202000
202100
202200
202300
202450
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 291 interconnected installs with a tariff recorded (291) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.072.4%not counted
NEM 2.028497.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 280 of GRID Alternatives North Valley, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 280. No residential system in the file lists a third-party owner name that matches GRID Alternatives North Valley, Inc. exactly.

Third-party owner named on its installsInstalls
Sunrun Financing, LLC279
SunRun Finance, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 287 of GRID Alternatives North Valley, Inc.’s 291 installs name a module maker in the “Generator Manufacturer” fields, and most of those (169, 58.9%) used modules recorded as Trina Solar.

Across all years, 291 of GRID Alternatives North Valley, Inc.’s 291 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (170, 58.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar0169
Canadian Solar062
LONGi024
REC014
SunPower010
Inverter makerEnphase0170
SolarEdge0120
Schneider Electric01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 287 of 291 installs, inverters on 291. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
867533GRID ALTERNATIVES (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 14, 2005Nov 30, 2027291

License numbers are the ones the utilities recorded on the interconnection applications (291 of 291 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 867533. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GRID Alternatives North Valley, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco86753316271024224572
unincorporated San Diego County86753329010000012
unincorporated Marin County8675330000000101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin110
Glenn38
Butte32
Yuba27
Contra Costa22
Sutter18
Shasta13
Yolo13
Placer9
Tehama8
Nevada1

Top cities

CityInstalls
Stockton99
Orland37
Oroville21
Pittsburg18
Marysville15
West Sacramento12
Cottonwood11
Yuba City11
Lincoln9
Olivehurst9
Chico8
Manteca8
Red Bluff7
Live Oak5
Rodeo3

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GRID Alternatives North Valley, Inc.232
GRID Alternatives North Valley53
GRID ALTERNATIVES NORTH VALLEY5
GRID Alternatives North Valley, Inc1

Common questions

Where does GRID Alternatives North Valley, Inc. install solar?

Its installs are spread across 11 counties. The most are in San Joaquin County (110 installs), followed by Glenn County (38).

How often does GRID Alternatives North Valley, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many GRID Alternatives North Valley, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 291 interconnected installs with a tariff recorded (291) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.