OCCIDENTAL POWER SOLAR & COGEN

How many solar installs has OCCIDENTAL POWER SOLAR & COGEN done in California, and which license number is on its installs?

OCCIDENTAL POWER SOLAR & COGEN has 234 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Nov 6, 2019 to Aug 24, 2026), most of them in San Francisco County (167), San Mateo County (27) and Alameda County (15). CSLB lists license 591549 (OCCIDENTAL POWER SOLAR & COGEN) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
234
Last 24 months
47
Total capacity
1,270 kW DC
Median system size
4.5 kW DC
With battery storage
25.2% all time; 44.7% last 24 months
Third-party owned
0.0% of 234 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
Median battery size
46.4 kWh (4 installs list a capacity)
First install
Nov 6, 2019
Latest install
Aug 24, 2026
Counties
10
Utilities
PGE 234
CSLB license
591549

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201980
2020296
2021315
2022365
2023468
20244316
2025229
2026 (through Aug 31, 2026)1910

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 234 interconnected installs (19.2% of the 234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.3%not counted
NEM 2.018679.5%25 (13.4%)
Net Billing Tariff4519.2%33 (73.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on OCCIDENTAL POWER SOLAR & COGEN’s installs. No residential system in the file lists a third-party owner name that matches OCCIDENTAL POWER SOLAR & COGEN exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 47 of OCCIDENTAL POWER SOLAR & COGEN’s 47 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 44.7%) used modules recorded as SunPower.

In the last 24 months, 47 of OCCIDENTAL POWER SOLAR & COGEN’s 47 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 97.9%) used inverters recorded as SolarEdge.

In the last 24 months, 20 of OCCIDENTAL POWER SOLAR & COGEN’s 47 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 95.0%) used batteries recorded as FranklinWH.

51 of 59 battery-paired PG&E and SCE installs (86.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower2139
Solaria13116
Mission Solar88
REC4not in top list
GermanSolar USA135
Inverter makerSolarEdge46226
FranklinWH1934
Sol-Ark14
Battery makerFranklinWH1933
Lithion Battery Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 219 of 234 installs, inverters on 234. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names OCCIDENTAL POWER SOLAR & COGEN as developer on 30 battery storage projects and as installer on 0 (0 name it as both), 30 projects in all with 351 kWh of storage. 14 have the status Paid, with $40,663 in current incentive allocations. Applications were received from Feb 8, 2018 to Dec 31, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14146$40,663
Pending Reservation113$17,553
Cancelled13170$29,289
RRF Rejected221$2,924

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage27316$69,95114$40,663
Residential Solar and Storage Equity - AB 209 Non-POU113$17,5530$0
Not stated221$2,9240$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
591549OCCIDENTAL POWER SOLAR & COGEN (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorMar 30, 1990Jun 30, 2027234

License numbers are the ones the utilities recorded on the interconnection applications (234 of 234 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 591549. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list OCCIDENTAL POWER SOLAR & COGEN’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco59154929313131463832143255
unincorporated Marin County5915490120000003

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Francisco167
San Mateo27
Alameda15
Marin15
Sonoma4
Santa Clara2
Contra Costa1
Mendocino1
Monterey1
Napa1

Top cities

CityInstalls
San Francisco166
Oakland9
Pacifica7
Mill Valley6
Berkeley5
Daly City5
Sonoma2
South San Francisco2
Stinson Beach2
Atherton1
Belmont1
Belvedere1
Brisbane1
Burlingame1
Calistoga1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OCCIDENTAL POWER SOLAR & COGEN234

Common questions

Where does OCCIDENTAL POWER SOLAR & COGEN install solar?

Its installs are spread across 10 counties. The most are in San Francisco County (167 installs), followed by San Mateo County (27).

How often does OCCIDENTAL POWER SOLAR & COGEN install batteries with solar?

25.2% of its interconnected solar installs include battery storage across all years, and 44.7% in the last 24 months (21 of 47).

How many OCCIDENTAL POWER SOLAR & COGEN installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 234 interconnected installs (19.2% of the 234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.