Regal Solar Electric Inc

How many solar installs has Regal Solar Electric Inc done in California, and which license number is on its installs?

Regal Solar Electric Inc has 601 residential solar installs interconnected in California, active in the records from 2018 through 2023 (Jun 22, 2018 to Feb 28, 2023), most of them in Contra Costa County (117), Alameda County (109) and Orange County (83). CSLB lists license 1024460 (BETTER EARTH ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
601
Last 24 months
0
Total capacity
3,720.7 kW DC
Median system size
5.4 kW DC
With battery storage
1.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
1.0% of 601 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 5, lease 1
Median battery size
9.8 kWh (7 installs list a capacity)
First install
Jun 22, 2018
Latest install
Feb 28, 2023
Counties
27
Utilities
PGE 394, SDGE 153, SCE 54
CSLB license
1024460

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018310
2019840
20203646
2021841
2022340
202340
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 601 interconnected installs with a tariff recorded (601) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0601100.0%7 (1.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 6 of Regal Solar Electric Inc’s installs the utility recorded a third-party ownership type: PPA 5, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Regal Solar Electric Inc exactly.

Third-party owner named on its installsInstalls
Sunnova3
BETTER EARTH ELECTRI1
Regal Solar1
Sighten1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 556 of Regal Solar Electric Inc’s 601 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (238, 42.8%) used modules recorded as Qcells.

Across all years, 601 of Regal Solar Electric Inc’s 601 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (544, 90.5%) used inverters recorded as SolarEdge.

Across all years, 7 of Regal Solar Electric Inc’s 601 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as LG.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells0238
JinkoSolar0154
Solaria098
LG037
Canadian Solar012
Inverter makerSolarEdge0544
Enphase063
Power-One07
ABB06
Fronius06
Battery makerLG07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 556 of 601 installs, inverters on 601. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Regal Solar Electric Inc as developer on 18 battery storage projects and as installer on 9 (9 name it as both), 18 projects in all with 269 kWh of storage. 11 have the status Paid, with $22,451 in current incentive allocations. Applications were received from May 8, 2020 to Sep 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11138$22,451
Reserved110$1,440
Cancelled6122$57,320

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16215$35,71211$22,451
Equity Resiliency254$45,5000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1024460BETTER EARTH ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 8, 2017Mar 31, 2027600

License numbers are the ones the utilities recorded on the interconnection applications (601 of 601 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1024460. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Regal Solar Electric Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023202420252026Total
City and County of San Francisco10244606242519496524158
unincorporated San Diego County10244600613467019509213
unincorporated Marin County1024460036000009

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa117
Alameda109
Orange83
San Diego78
Santa Clara42
Solano32
San Mateo23
Los Angeles16
San Joaquin14
Napa12
Riverside11
San Bernardino10
San Francisco10
Marin7
Merced7
Sonoma6
Kern5
Fresno4
Ventura3
Placer2
San Benito2
Santa Barbara2
Yuba2
El Dorado1
Santa Cruz1
Stanislaus1
Tulare1

Top cities

CityInstalls
San Jose30
Rch Msn Viejo29
San Diego24
Oakland20
Antioch19
Hayward17
Walnut Creek15
Concord14
Vallejo12
Danville11
Berkeley10
Fremont10
Laguna Hills10
Las Flores10
Pittsburg10

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
REGAL SOLAR ELECTRIC INC367
Regal Solar Electric Inc183
Regal Solar Electric Inc.47
Regal Solar Electric1
Regal solar Electric Inc1
Regal Solar electric Inc1
REGAL SOLAR ELECTRIC INC.1

Common questions

Where does Regal Solar Electric Inc install solar?

Its installs are spread across 27 counties. The most are in Contra Costa County (117 installs), followed by Alameda County (109).

How often does Regal Solar Electric Inc install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Regal Solar Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 601 interconnected installs with a tariff recorded (601) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.