Promise Energy

How many solar installs has Promise Energy done in California, and which license number is on its installs?

Promise Energy has 80 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jan 15, 2015 to Jul 31, 2026), most of them in Los Angeles County (32), San Diego County (12) and Monterey County (8). CSLB lists license 978353 (PROMISE ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
80
Last 24 months
6
Total capacity
4,445.2 kW DC
Median system size
22.9 kW DC
With battery storage
4.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 16.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 80 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Feb 23, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (2 installs list a capacity)
First install
Jan 15, 2015
Latest install
Jul 31, 2026
Counties
10
Utilities
SCE 52, PGE 16, SDGE 12
CSLB license
978353

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201580
201600
201700
201870
2019332
2020160
202160
202220
202310
202410
202540
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 80 interconnected installs (6.3% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0911.3%not counted
NEM 2.06682.5%3 (5.6%)
Net Billing Tariff56.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Promise Energy’s installs. No residential system in the file lists a third-party owner name that matches Promise Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Promise Energy’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as JA Solar.

In the last 24 months, 6 of Promise Energy’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, none of Promise Energy’s 6 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 3 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar4not in top list
Canadian Solar1not in top list
LONGi17
NINGBO DEYE ESS Technology CO., LTD1not in top list
Inverter makerSolarEdge659
Sol-Ark1not in top list
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 74 of 80 installs, inverters on 80. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Promise Energy as developer on 219 battery storage projects and as installer on 224 (218 name it as both), 225 projects in all with 44,801 kWh of storage. 4 have the status Paid, with $520,778 in current incentive allocations. Applications were received from Feb 5, 2019 to Nov 12, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4642$520,778
Reserved2413$126,227
Cancelled21943,746$35,231,368

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Storage Equity16532,860$27,309,4613$517,982
Equity Resiliency337,638$7,432,2870$0
Large-Scale Storage224,239$1,123,4040$0
Small Residential Storage564$13,2211$2,796

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978353PROMISE ENERGY INC (Corporation)CLEARB General Building ContractorOct 30, 2012Oct 31, 202880

License numbers are the ones the utilities recorded on the interconnection applications (80 of 80 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 978353. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Promise Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
City and County of San Francisco97835311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles32
San Diego12
Monterey8
Contra Costa6
Orange5
Tulare5
San Bernardino4
Kern3
Ventura3
San Francisco2

Top cities

CityInstalls
Long Beach12
Oceanside12
Salinas8
El Monte7
Santa Monica7
Richmond5
Tulare5
Delano3
Fontana3
Irvine2
Pomona2
San Francisco2
Santa Ana2
Baldwin Park1
Brentwood1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PROMISE ENERGY INC49
Promise Energy12
Promise Energy Inc7
Promise Energy, Inc.7
Promise Energy, Inc4
Promise Energy Inc.1

Common questions

Where does Promise Energy install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (32 installs), followed by San Diego County (12).

How often does Promise Energy install batteries with solar?

4.4% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (1 of 6). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Promise Energy installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 80 interconnected installs (6.3% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.