COASTSIDE CLEAN ENERGY

How many solar installs has COASTSIDE CLEAN ENERGY done in California, and which license number is on its installs?

COASTSIDE CLEAN ENERGY has 40 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jan 9, 2024 to Aug 10, 2026), most of them in San Mateo County (16), San Francisco County (8) and Alameda County (6). CSLB lists license 1084515 (COASTSIDE CLEAN ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
36
Total capacity
238.7 kW DC
Median system size
5.1 kW DC
With battery storage
80.0% all time; 83.3% last 24 months
Third-party owned
2.5% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Aug 10, 2026
Ownership types recorded
PPA 1
Median battery size
14 kWh (14 installs list a capacity)
First install
Jan 9, 2024
Latest install
Aug 10, 2026
Counties
8
Utilities
PGE 40
CSLB license
1084515

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202442
20251715
2026 (through Aug 31, 2026)1915

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 40 interconnected installs (82.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.5%not counted
NEM 2.0615.0%3 (50.0%)
Net Billing Tariff3382.5%28 (84.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of COASTSIDE CLEAN ENERGY’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches COASTSIDE CLEAN ENERGY exactly.

Third-party owner named on its installsInstalls
SunPower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of COASTSIDE CLEAN ENERGY’s 36 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 33.3%) used modules recorded as JA Solar.

In the last 24 months, 36 of COASTSIDE CLEAN ENERGY’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 55.6%) used inverters recorded as Tesla.

In the last 24 months, 26 of COASTSIDE CLEAN ENERGY’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (13, 50.0%) used batteries recorded as Tesla.

28 of 32 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar1212
Hyundai1010
SunPower88
Qcells47
Waaree2not in top list
Inverter makerTesla2022
SunPower99
Lunar Energy55
Enphase45
FranklinWH44
Battery makerTesla1315
Lunar Energy55
FranklinWH44
SunPower44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names COASTSIDE CLEAN ENERGY as developer on 8 battery storage projects and as installer on 9 (8 name it as both), 9 projects in all with 222 kWh of storage. 3 have the status Paid, with $31,950 in current incentive allocations. Applications were received from Feb 16, 2024 to Jul 9, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid394$31,950
Reserved230$27,450
Cancelled385$13,305
RRF Rejected113$1,980

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage345$6,7501$2,250
Large-Scale Storage2106$26,4001$16,500
Residential Solar and Storage Equity - AB 209 Non-POU245$26,3550$0
Equity Resiliency113$13,2001$13,200
Not stated113$1,9800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1084515COASTSIDE CLEAN ENERGY (Limited Liability)CLEAR, WC Susp PendingB General Building Contractor; C-10 Electrical ContractorDec 3, 2021Dec 31, 202740

License numbers are the ones the utilities recorded on the interconnection applications (40 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1084515. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list COASTSIDE CLEAN ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023202420252026Total
City and County of San Francisco10845151443127278

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Mateo16
San Francisco8
Alameda6
Santa Clara5
Monterey2
Contra Costa1
Marin1
Santa Cruz1

Top cities

CityInstalls
San Francisco8
Pacifica7
San Jose4
Berkeley3
Carmel2
Montara2
Moss Beach2
Belmont1
El Granada1
Foster City1
Larkspur1
Los Altos Hills1
Menlo Park1
Moraga1
Oakland1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
COASTSIDE CLEAN ENERGY40

Common questions

Where does COASTSIDE CLEAN ENERGY install solar?

Its installs are spread across 8 counties. The most are in San Mateo County (16 installs), followed by San Francisco County (8).

How often does COASTSIDE CLEAN ENERGY install batteries with solar?

80.0% of its interconnected solar installs include battery storage across all years, and 83.3% in the last 24 months (30 of 36).

How many COASTSIDE CLEAN ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 40 interconnected installs (82.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.