How many solar installs has Albion Power Company done in California, and which license number is on its installs?
Albion Power Company has 561 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Jan 31, 2007 to Aug 27, 2026), most of them in San Francisco County (255), Alameda County (230) and Contra Costa County (37). CSLB lists license 878027 (ALBION POWER COMPANY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires May 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 561
- Last 24 months
- 68
- Total capacity
- 3,340.5 kW DC
- Median system size
- 5.6 kW DC
- With battery storage
- 16.0% all time; 83.8% last 24 months
- Third-party owned
- 0.0% of 561 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 72 installs, latest Aug 27, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 1 kWh (34 installs list a capacity)
- First install
- Jan 31, 2007
- Latest install
- Aug 27, 2026
- Counties
- 8
- Utilities
- PGE 561
- CSLB license
- 878027
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2007 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2007 | 2 | 0 |
| 2008 | 19 | 0 |
| 2009 | 4 | 0 |
| 2010 | 4 | 0 |
| 2011 | 5 | 0 |
| 2012 | 2 | 0 |
| 2013 | 7 | 0 |
| 2014 | 18 | 0 |
| 2015 | 21 | 0 |
| 2016 | 38 | 0 |
| 2017 | 28 | 0 |
| 2018 | 39 | 0 |
| 2019 | 52 | 1 |
| 2020 | 39 | 1 |
| 2021 | 54 | 4 |
| 2022 | 74 | 12 |
| 2023 | 58 | 6 |
| 2024 | 43 | 22 |
| 2025 | 37 | 30 |
| 2026 (through Aug 31, 2026) | 17 | 14 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
72 of its 561 interconnected installs (12.8% of the 561 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 123 | 21.9% | not counted |
| NEM 2.0 | 366 | 65.2% | 30 (8.2%) |
| Net Billing Tariff | 72 | 12.8% | 59 (81.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Albion Power Company’s installs. No residential system in the file lists a third-party owner name that matches Albion Power Company exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 67 of Albion Power Company’s 68 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 50.7%) used modules recorded as SunPower.
In the last 24 months, 68 of Albion Power Company’s 68 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 69.1%) used inverters recorded as Tesla.
In the last 24 months, 54 of Albion Power Company’s 68 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (44, 81.5%) used batteries recorded as Tesla.
86 of 90 battery-paired PG&E and SCE installs (95.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 34 | 271 |
| REC | 27 | 27 | |
| Panasonic | 3 | 31 | |
| Solaria | 2 | not in top list | |
| Canadian Solar | 1 | not in top list | |
| Inverter maker | Tesla | 47 | 52 |
| Enphase | 20 | 86 | |
| SMA | 3 | 323 | |
| Kaco | 1 | not in top list | |
| SunPower | 1 | 85 | |
| Battery maker | Tesla | 44 | 49 |
| Enphase | 9 | 14 | |
| SunPower | 1 | 19 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 548 of 561 installs, inverters on 561. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Albion Power Company as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 15, 2019 to Feb 15, 2019.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Cancelled | 1 | 8 | $2,492 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 1 | 8 | $2,492 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 878027 | ALBION POWER COMPANY INC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor | May 19, 2006 | May 31, 2028 | 516 |
License numbers are the ones the utilities recorded on the interconnection applications (516 of 561 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 878027. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Albion Power Company’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 878027 | 31 | 25 | 24 | 14 | 22 | 17 | 6 | 13 | 12 | 164 |
| unincorporated Marin County | 878027 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 3 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| San Francisco | 255 |
| Alameda | 230 |
| Contra Costa | 37 |
| Marin | 19 |
| San Mateo | 8 |
| Santa Clara | 8 |
| Sonoma | 3 |
| Napa | 1 |
Top cities
| City | Installs |
|---|---|
| San Francisco | 255 |
| Berkeley | 105 |
| Oakland | 99 |
| El Cerrito | 16 |
| Piedmont | 13 |
| Albany | 10 |
| Mill Valley | 6 |
| Orinda | 6 |
| Lafayette | 5 |
| San Jose | 5 |
| Kensington | 4 |
| San Rafael | 4 |
| Richmond | 3 |
| Bolinas | 2 |
| Corte Madera | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ALBION POWER COMPANY INC | 337 |
| Albion Power Company | 143 |
| Albion Power Company, Inc. | 44 |
| Albion Power | 13 |
| ALBION POWER COMPANY | 13 |
| Albion Power Company Inc | 5 |
| Albion Power Company, Inc | 3 |
| Albion Power Co Inc | 2 |
| Albion Power Co Inc. | 1 |
Common questions
Where does Albion Power Company install solar?
Its installs are spread across 8 counties. The most are in San Francisco County (255 installs), followed by Alameda County (230).
How often does Albion Power Company install batteries with solar?
16.0% of its interconnected solar installs include battery storage across all years, and 83.8% in the last 24 months (57 of 68).
How many Albion Power Company installs are under NEM 3.0 (the Net Billing Tariff)?
72 of its 561 interconnected installs (12.8% of the 561 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.