SUTRO POWER

How many solar installs has SUTRO POWER done in California, and which license number is on its installs?

SUTRO POWER has 280 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 14, 2021 to Aug 27, 2026), most of them in San Francisco County (239), San Mateo County (17) and Alameda County (11). CSLB lists license 1066207 (SUTRO POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
280
Last 24 months
97
Total capacity
1,628.2 kW DC
Median system size
5.4 kW DC
With battery storage
23.9% all time; 62.9% last 24 months
Third-party owned
0.0% of 280 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
63 installs, latest Jun 16, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (40 installs list a capacity)
First install
Jan 14, 2021
Latest install
Aug 27, 2026
Counties
7
Utilities
PGE 280
CSLB license
1066207

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021271
2022453
2023840
20244610
20255338
2026 (through Aug 31, 2026)2515

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

63 of its 280 interconnected installs (22.5% of the 280 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.1% of those include battery storage. The latest Net Billing Tariff install was approved Jun 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041.4%not counted
NEM 2.021376.1%6 (2.8%)
Net Billing Tariff6322.5%58 (92.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUTRO POWER’s installs. No residential system in the file lists a third-party owner name that matches SUTRO POWER exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 91 of SUTRO POWER’s 97 installs name a module maker in the “Generator Manufacturer” fields, and most of those (49, 53.8%) used modules recorded as Hyundai.

In the last 24 months, 97 of SUTRO POWER’s 97 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (41, 42.3%) used inverters recorded as Enphase.

In the last 24 months, 58 of SUTRO POWER’s 97 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (29, 50.0%) used batteries recorded as Tesla.

63 of 67 battery-paired PG&E and SCE installs (94.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai4971
REC31144
SEG Solar5not in top list
JA Solar4not in top list
Aptos Solar16
Inverter makerEnphase41218
Tesla3131
PointGuard Energy Inc.2020
Sigenergy77
SMA24
Battery makerTesla2929
PointGuard Energy Inc.1818
Sigenergy66
Enphase59

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 261 of 280 installs, inverters on 280. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUTRO POWER as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 66 kWh of storage. 1 have the status Paid, with $3,960 in current incentive allocations. Applications were received from Apr 28, 2025 to Oct 10, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid126$3,960
Reserved225$28,427
RRF Rejected115$2,276

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage236$5,3881$3,960
Residential Solar and Storage Equity - AB 209 Non-POU115$27,0000$0
Not stated115$2,2760$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1066207SUTRO POWER (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 9, 2020Jun 30, 2028279

License numbers are the ones the utilities recorded on the interconnection applications (279 of 280 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1066207. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUTRO POWER’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120222023202420252026Total
City and County of San Francisco10662074405258758946364
unincorporated Marin County106620701000001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Francisco239
San Mateo17
Alameda11
Contra Costa5
Marin5
Sonoma2
Santa Clara1

Top cities

CityInstalls
San Francisco238
Berkeley5
Daly City5
Oakland3
San Mateo3
San Carlos2
San Leandro2
South San Francisco2
Albany1
Crockett1
Fairfax1
Half Moon Bay1
Hercules1
Hillsborough1
Kensington1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUTRO POWER277
Sutro Power3

Common questions

Where does SUTRO POWER install solar?

Its installs are spread across 7 counties. The most are in San Francisco County (239 installs), followed by San Mateo County (17).

How often does SUTRO POWER install batteries with solar?

23.9% of its interconnected solar installs include battery storage across all years, and 62.9% in the last 24 months (61 of 97).

How many SUTRO POWER installs are under NEM 3.0 (the Net Billing Tariff)?

63 of its 280 interconnected installs (22.5% of the 280 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.