Sun Light and Power
How many solar installs has Sun Light and Power done in California, and which license number is on its installs?
Sun Light and Power has 1,167 residential solar installs interconnected in California, active in the records from 2001 through 2026 (Aug 14, 2001 to Aug 27, 2026), most of them in Alameda County (640), Contra Costa County (237) and San Francisco County (108). CSLB lists license 326203 (SUN LIGHT & POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jul 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,167
- Last 24 months
- 213
- Total capacity
- 8,991.8 kW DC
- Median system size
- 4.4 kW DC
- With battery storage
- 22.7% all time; 81.2% last 24 months
- Third-party owned
- 1.5% of 1,167 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 214 installs, latest Aug 27, 2026
- Ownership types recorded
- other 17
- Median battery size
- 13.5 kWh (61 installs list a capacity)
- First install
- Aug 14, 2001
- Latest install
- Aug 27, 2026
- Counties
- 17
- Utilities
- PGE 1,167
- CSLB license
- 326203
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2001 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2001 | 6 | 0 |
| 2002 | 21 | 0 |
| 2003 | 33 | 0 |
| 2004 | 43 | 0 |
| 2005 | 50 | 0 |
| 2006 | 84 | 0 |
| 2007 | 86 | 0 |
| 2008 | 63 | 0 |
| 2009 | 137 | 0 |
| 2010 | 60 | 0 |
| 2011 | 28 | 0 |
| 2012 | 19 | 0 |
| 2013 | 29 | 0 |
| 2014 | 21 | 0 |
| 2015 | 13 | 0 |
| 2016 | 7 | 0 |
| 2017 | 7 | 0 |
| 2018 | 7 | 0 |
| 2019 | 5 | 0 |
| 2020 | 10 | 3 |
| 2021 | 31 | 4 |
| 2022 | 50 | 15 |
| 2023 | 100 | 39 |
| 2024 | 60 | 43 |
| 2025 | 100 | 90 |
| 2026 (through Aug 31, 2026) | 97 | 71 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
214 of its 1,167 interconnected installs (18.3% of the 1,167 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 706 | 60.5% | not counted |
| NEM 2.0 | 247 | 21.2% | 74 (30.0%) |
| Net Billing Tariff | 214 | 18.3% | 187 (87.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 17 of Sun Light and Power’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 17. No residential system in the file lists a third-party owner name that matches Sun Light and Power exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Regents of University of California | 16 |
| Regent of University of California | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 202 of Sun Light and Power’s 213 installs name a module maker in the “Generator Manufacturer” fields, and most of those (140, 69.3%) used modules recorded as REC.
In the last 24 months, 213 of Sun Light and Power’s 213 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (131, 61.5%) used inverters recorded as SolarEdge.
In the last 24 months, 148 of Sun Light and Power’s 213 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (98, 66.2%) used batteries recorded as Tesla.
219 of 265 battery-paired PG&E and SCE installs (82.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 140 | 264 |
| SEG Solar | 26 | not in top list | |
| Qcells | 22 | 81 | |
| JA Solar | 11 | not in top list | |
| Anker Innovations Limited | 6 | not in top list | |
| Inverter maker | SolarEdge | 131 | 369 |
| Tesla | 110 | 188 | |
| FranklinWH | 46 | not in top list | |
| Enphase | 8 | not in top list | |
| Anker Innovations Limited | 7 | not in top list | |
| Battery maker | Tesla | 98 | 162 |
| FranklinWH | 44 | 44 | |
| Enphase | 5 | 5 | |
| LG | 1 | 5 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,088 of 1,167 installs, inverters on 1,166. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Sun Light and Power as developer on 18 battery storage projects and as installer on 17 (17 name it as both), 18 projects in all with 763 kWh of storage. 5 have the status Paid, with $60,387 in current incentive allocations. Applications were received from Oct 24, 2018 to Feb 2, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 5 | 167 | $60,387 |
| Reserved | 1 | 205 | $36,913 |
| Pending Reservation | 2 | 41 | $56,933 |
| Cancelled | 5 | 284 | $36,168 |
| RRF Rejected | 5 | 66 | $10,680 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Large-Scale Storage | 5 | 555 | $99,181 | 2 | $33,060 |
| Small Residential Storage | 5 | 74 | $11,218 | 2 | $4,258 |
| Equity Resiliency | 1 | 26 | $23,069 | 1 | $23,069 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 1 | 15 | $23,933 | 0 | $0 |
| Residential Solar and Storage Equity - Ratepayer | 1 | 26 | $33,000 | 0 | $0 |
| Not stated | 5 | 66 | $10,680 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 326203 | SUN LIGHT & POWER (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor | Oct 12, 1976 | Jul 31, 2027 | 497 |
License numbers are the ones the utilities recorded on the interconnection applications (499 of 1,167 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 326203. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Sun Light and Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 326203 | 8 | 2 | 6 | 12 | 6 | 5 | 11 | 10 | 7 | 67 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| Alameda | 640 |
| Contra Costa | 237 |
| San Francisco | 108 |
| San Mateo | 53 |
| Marin | 48 |
| Santa Clara | 25 |
| Sonoma | 25 |
| Napa | 13 |
| Solano | 8 |
| Monterey | 2 |
| Yolo | 2 |
| Fresno | 1 |
| Madera | 1 |
| Mendocino | 1 |
| Sacramento | 1 |
| San Luis Obispo | 1 |
| Sutter | 1 |
Top cities
| City | Installs |
|---|---|
| Berkeley | 271 |
| Oakland | 232 |
| San Francisco | 108 |
| Richmond | 58 |
| El Cerrito | 46 |
| Piedmont | 35 |
| Albany | 32 |
| Orinda | 27 |
| Kensington | 22 |
| Lafayette | 20 |
| Hayward | 19 |
| Walnut Creek | 18 |
| Mill Valley | 11 |
| San Leandro | 10 |
| Danville | 9 |
Names as recorded by the utilities
The utilities recorded this installer under 22 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SUN LIGHT & POWER | 460 |
| Sun Light and Power | 274 |
| Sun Light & Power | 247 |
| Sun Light and Power Co. | 79 |
| Sun Light and Power Co | 38 |
| Sun Light & Power Co. | 23 |
| Sun, Light & Power Company | 9 |
| Sun Light and Power co. | 7 |
| Sun Light & Power Co | 5 |
| Sun Light and Power Company | 4 |
| Sun, Light & Power | 4 |
| Sun, Light and Power Company | 4 |
| SUN LIGHT AND POWER | 3 |
| Sun Light & Power Company | 2 |
| Sun light & Power | 1 |
| Sun Light & power | 1 |
| Sun Light & Power, Co | 1 |
| Sun Light & Power, Co. | 1 |
| Sun light and Power Co | 1 |
| Sun, LIght & Power | 1 |
| Sun, Light & Power, Inc. | 1 |
| Sun, Light, & Power | 1 |
Common questions
Where does Sun Light and Power install solar?
Its installs are spread across 17 counties. The most are in Alameda County (640 installs), followed by Contra Costa County (237).
How often does Sun Light and Power install batteries with solar?
22.7% of its interconnected solar installs include battery storage across all years, and 81.2% in the last 24 months (173 of 213).
How many Sun Light and Power installs are under NEM 3.0 (the Net Billing Tariff)?
214 of its 1,167 interconnected installs (18.3% of the 1,167 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.