Luminalt Energy Corporation

How many solar installs has Luminalt Energy Corporation done in California, and which license number is on its installs?

Luminalt Energy Corporation has 2,589 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Oct 27, 2006 to Aug 27, 2026), most of them in San Francisco County (2,003), San Mateo County (209) and Alameda County (169). CSLB lists license 845219 (LUMINALT ENERGY CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,589
Last 24 months
327
Total capacity
13,501.2 kW DC
Median system size
4.3 kW DC
With battery storage
26.3% all time; 81.7% last 24 months
Third-party owned
0.0% of 2,589 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
277 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (239 installs list a capacity)
First install
Oct 27, 2006
Latest install
Aug 27, 2026
Counties
11
Utilities
PGE 2,589
CSLB license
845219

Is Luminalt Energy Corporation still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (162 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200750
2008180
20091190
20101230
20111180
2012790
2013840
2014830
20151022
20161540
2017890
201814814
201918458
202016747
202118683
202223987
202325661
2024164107
2025167132
2026 (through Aug 31, 2026)10390

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

277 of its 2,589 interconnected installs (10.7% of the 2,589 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.092035.5%not counted
NEM 2.01,39253.8%405 (29.1%)
Net Billing Tariff27710.7%256 (92.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Luminalt Energy Corporation’s installs. No residential system in the file lists a third-party owner name that matches Luminalt Energy Corporation exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 303 of Luminalt Energy Corporation’s 327 installs name a module maker in the “Generator Manufacturer” fields, and most of those (216, 71.3%) used modules recorded as Qcells.

In the last 24 months, 327 of Luminalt Energy Corporation’s 327 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (266, 81.3%) used inverters recorded as Tesla.

In the last 24 months, 226 of Luminalt Energy Corporation’s 327 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (203, 89.8%) used batteries recorded as Tesla.

585 of 681 battery-paired PG&E and SCE installs (85.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells216269
JA Solar5050
SunPower421,935
Sharp3not in top list
Hyundai2not in top list
Inverter makerTesla266704
Enphase47201
SunPower401,773
SMA15247
Xantrex Technology Inc.6not in top list
Battery makerTesla203563
Enphase2222
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,426 of 2,589 installs, inverters on 2,589. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Luminalt Energy Corporation as developer on 344 battery storage projects and as installer on 339 (339 name it as both), 344 projects in all with 7,531 kWh of storage. 284 have the status Paid, with $1,765,596 in current incentive allocations. Applications were received from May 1, 2017 to Jun 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2846,125$1,765,596
PBI in Process140$12,180
Reserved115$32,952
Cancelled571,325$381,232
RRF Rejected126$4,640

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage3176,380$1,830,331268$1,543,860
Large-Scale Storage231,056$289,07714$182,136
Equity Resiliency253$39,6002$39,600
Residential Solar and Storage Equity - AB 209 Non-POU115$32,9520$0
Not stated126$4,6400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
845219LUMINALT ENERGY CORPORATION (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorAug 23, 2004Jul 31, 20282,003

License numbers are the ones the utilities recorded on the interconnection applications (2,006 of 2,589 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 845219. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Luminalt Energy Corporation’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco845219199298164190219186130133891,608
unincorporated Marin County84521907461001019

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Francisco2,003
San Mateo209
Alameda169
Marin123
Contra Costa41
Santa Clara27
Sonoma11
San Benito2
Solano2
Napa1
San Luis Obispo1

Top cities

CityInstalls
San Francisco1,999
Oakland71
Berkeley55
Pacifica26
San Mateo26
Mill Valley24
Hillsborough19
Burlingame17
Tiburon15
Menlo Park13
San Rafael13
San Bruno12
Orinda11
Piedmont11
South San Francisco11

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LUMINALT ENERGY CORPORATION1,337
Luminalt Energy Corporation1,218
Luminalt Energy Corp.13
Luminalt Energy Corp10
Luminalt Energy Company7
Luminalt Energy1
Luminalt Energy Co.1
Luminalt energy Corporation1
Luminalt ENergy Corporation1

Common questions

Where does Luminalt Energy Corporation install solar?

Its installs are spread across 11 counties. The most are in San Francisco County (2,003 installs), followed by San Mateo County (209).

How often does Luminalt Energy Corporation install batteries with solar?

26.3% of its interconnected solar installs include battery storage across all years, and 81.7% in the last 24 months (267 of 327).

How many Luminalt Energy Corporation installs are under NEM 3.0 (the Net Billing Tariff)?

277 of its 2,589 interconnected installs (10.7% of the 2,589 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.