How many solar installs has A.M. Sun Solar done in California, and which license number is on its installs?

A.M. Sun Solar has 2,464 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jul 21, 2010 to Aug 17, 2026), most of them in San Luis Obispo County (2,184), Santa Barbara County (193) and Monterey County (46). CSLB lists license 969522 (A.M. SUN SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,464
Last 24 months
168
Total capacity
17,716.8 kW DC
Median system size
6.1 kW DC
With battery storage
15.7% all time; 55.4% last 24 months
Third-party owned
3.2% of 2,464 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
161 installs, latest Aug 17, 2026
Ownership types recorded
PPA 67, lease 11, other 1
Median battery size
13.5 kWh (92 installs list a capacity)
First install
Jul 21, 2010
Latest install
Aug 17, 2026
Counties
11
Utilities
PGE 2,448, SCE 16
CSLB license
969522

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201030
201140
201290
2013110
2014440
2015990
20161270
20172090
2018450
20191186
202030346
202134048
202243368
202343769
202416388
20257635
2026 (through Aug 31, 2026)4328

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

161 of its 2,464 interconnected installs (6.5% of the 2,464 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032313.1%not counted
NEM 2.01,98080.4%250 (12.6%)
Net Billing Tariff1616.5%124 (77.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 79 of A.M. Sun Solar’s installs the utility recorded a third-party ownership type: PPA 67, lease 11, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches A.M. Sun Solar exactly.

Third-party owner named on its installsInstalls
Clean Power Finance30
SunRun16
Sunnova11
CPF7
Spruce6

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 144 of A.M. Sun Solar’s 168 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (62, 43.1%) used modules recorded as JinkoSolar.

In the last 24 months, 168 of A.M. Sun Solar’s 168 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (120, 71.4%) used inverters recorded as Tesla.

In the last 24 months, 72 of A.M. Sun Solar’s 168 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (66, 91.7%) used batteries recorded as Tesla.

323 of 388 battery-paired PG&E and SCE installs (83.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar62325
Canadian Solar34543
REC14not in top list
Heliene10353
Znshine10not in top list
Inverter makerTesla120582
APsystems (Altenergy Power System)441,349
SolarEdge14485
Enphase9148
SMA796
Battery makerTesla66306
Enphase413
FranklinWH11
LG18

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,243 of 2,464 installs, inverters on 2,464. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names A.M. Sun Solar as developer on 479 battery storage projects and as installer on 144 (144 name it as both), 479 projects in all with 12,379 kWh of storage. 362 have the status Paid, with $7,852,254 in current incentive allocations. Applications were received from Jul 22, 2019 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3629,399$7,852,254
Reserved126$6,600
Cancelled1122,901$2,447,668
RRF Rejected453$9,280

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency3419,985$9,916,587264$7,586,219
Small Residential Storage1101,945$293,17994$248,479
Large-Scale Storage24396$96,7564$17,556
Not stated453$9,2800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
969522A.M. SUN SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorJan 25, 2012Jan 31, 20282,433

License numbers are the ones the utilities recorded on the interconnection applications (2,439 of 2,464 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 969522. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Luis Obispo2,184
Santa Barbara193
Monterey46
Fresno21
Tulare6
Madera4
San Bernardino4
Orange2
Santa Clara2
Kings1
Riverside1

Top cities

CityInstalls
Paso Robles776
Atascadero377
San Luis Obispo204
Templeton184
Arroyo Grande135
Santa Maria132
Nipomo98
Los Osos86
San Miguel70
Cambria47
Morro Bay37
Creston33
Pismo Beach33
Grover Beach31
Santa Margarita24

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A.M. SUN SOLAR1,871
A.M. Sun Solar380
A. M. Sun Solar146
A.M. sun solar33
A.M Sun Solar13
A.M. Sun Solar, Inc.7
A M Sun Solar5
A.M.Sun Solar5
A.M. Sun solar4

Common questions

Where does A.M. Sun Solar install solar?

Its installs are spread across 11 counties. The most are in San Luis Obispo County (2,184 installs), followed by Santa Barbara County (193).

How often does A.M. Sun Solar install batteries with solar?

15.7% of its interconnected solar installs include battery storage across all years, and 55.4% in the last 24 months (93 of 168).

How many A.M. Sun Solar installs are under NEM 3.0 (the Net Billing Tariff)?

161 of its 2,464 interconnected installs (6.5% of the 2,464 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 77.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.