Solar installers in Placerville, California

Most installs here are in El Dorado County.

Who installs the most solar in Placerville?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Placerville are V3 Electric (98), Sunrun (55) and Citadel Roofing and Solar (45). They account for 198 of the 484 residential solar installs interconnected there in that window.

In all, 3,638 homes in Placerville have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 85 installers with installs in this window. 29 installs in the window were self-installed or had no installer recorded.

1V3 Electric98450
2Sunrun55222
3Citadel Roofing and Solar4548
4BRIGHT OPS2124
5SENGA ENERGY LLC2128
6SolarHut, LLC18141
7Tesla Energy Operations (formerly SolarCity)13271
8SOLAR AND ROOF DIRECT1111
9DIAMOND SOLAR SOLUTIONS INC926
10Sierra Energy Savers933
11COMFORT CONTROLS HEATING & AIR CONDITIONING827
12IE CONSTRUCTION88
13SOLAR SAVINGS DIRECT INC888
14NORTH VALLEY LLC717
15PEAK ENERGY GROUP66
16SOLCORE INC66
17AXIA SOLAR CORP44
18CONTINUUM44
19FREEDOM FOREVER LLC465
20Hooked On Solar460
21Infinity Energy, Inc421
22ORIGIN SOLAR USA INC44
23Apex Solar, Inc.325
24Evergreen311
25Future Energy Corporation317

Most installs, all time

1V3 Electric450450
2Tesla Energy Operations (formerly SolarCity)271271
3Sunrun222222
4SolarHut, LLC141141
5Gold Rush Energy Solutions108108
6SOLAR SAVINGS DIRECT INC8888
7Vivint Solar Developer, LLC8080
8FREEDOM FOREVER LLC6565
9Bright Planet Solar6060
10Hooked On Solar6060

Installs by year

YearInstalls interconnectedWith battery storage
202243783
202347394
2024262195
2025252199
2026 (through Aug 31, 2026)152115

Under the Net Billing Tariff (NEM 3.0)

549 of the 3,638 residential solar installs in Placerville (15.1% of the 3,637 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those include battery storage. The latest was approved Aug 25, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Placerville

1V3 Electric14113797.2%
2Sunrun6969100.0%
3BRIGHT OPS2424100.0%
4SENGA ENERGY LLC232295.7%
5SOLAR SAVINGS DIRECT INC191894.7%
6Tesla Energy Operations (formerly SolarCity)1616100.0%
7SolarHut, LLC151386.7%
8Bright Planet Solar121191.7%
9NORTH VALLEY LLC1212100.0%
10DIAMOND SOLAR SOLUTIONS INC111090.9%
11SOLAR AND ROOF DIRECT1111100.0%
12Empower Electric Solar9777.8%
13Sierra Energy Savers9333.3%
14COMFORT CONTROLS HEATING & AIR CONDITIONING7685.7%
15FREEDOM FOREVER LLC7685.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 453 of Placerville’s 484 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (127, 28.0%) used modules recorded as JA Solar.

In the last 24 months, 484 of Placerville’s 484 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (251, 51.9%) used inverters recorded as Enphase.

In the last 24 months, 325 of Placerville’s 484 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (163, 50.2%) used batteries recorded as Tesla.

689 of 824 battery-paired PG&E and SCE installs (83.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar127203
Qcells120900
LONGi35154
Canadian Solar32256
Silfab23not in top list
Inverter makerEnphase2511,445
Tesla200399
SolarEdge871,260
FranklinWH24not in top list
Sol-Ark7not in top list
Battery makerTesla163302
Enphase90176
SolarEdge3771
FranklinWH2229
Generac322

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,375 of 3,638 installs, inverters on 3,638. See the methodology and the equipment index.

ZIP codes in Placerville

ZIP codes with their own page where the utilities recorded Placerville on at least 10% of the ZIP’s installs, through Aug 31, 2026.

956673,6333,704494

SGIP battery storage projects in Placerville

The SGIP report lists 544 battery storage projects with the city Placerville, 353 with the status Paid ($7,179,020 in current incentive allocations, 9,021 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid3539,021$7,179,020
PBI in Process710,495$8,175,385
Reserved17312$414,751
Pending Reservation236$56,326
Cancelled16410,562$6,068,956
RRF Rejected113$1,740

Installers named on the most SGIP storage projects in Placerville

InstallerProjectsPaid
SWELL SERVICES INC DBA SWELL CONTRACTORS8056
V3 Electric7256
Hooked On Solar5745
Semper Solaris Construction Inc3324
Gold Rush Energy Solutions2618
SOLAR SAVINGS DIRECT INC239
Tesla2213
Infinity Energy, Inc2014
SolarHut, LLC2017
Sunrun209

42 of the 544 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
3,638
Last 24 months
484
Capacity
29.2 MW DC
Median system size
7.4 kW DC
With battery storage
22.6% all time; 78.7% last 24 months
Third-party owned
26.3% where reported
Ownership types recorded
PPA 847, lease 91, prepaid lease 3, other 14
Median battery size
13.5 kWh
Earliest install in data
Jan 12, 2000

Common questions

How many homes in Placerville have solar?

3,638 residential solar systems in Placerville were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 484 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Placerville?

85 installer names have at least one install interconnected in Placerville in the last 24 months, and 422 appear in the full record.

How common are batteries with new solar in Placerville?

22.6% of the solar installs interconnected in Placerville include battery storage across all years, and 78.7% in the last 24 months (381 of 484).

How many solar installs in Placerville are under NEM 3.0?

549 of the 3,638 residential solar installs in Placerville (15.1% of the 3,637 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.