DIAMOND SOLAR SOLUTIONS INC

How many solar installs has DIAMOND SOLAR SOLUTIONS INC done in California, and which license number is on its installs?

DIAMOND SOLAR SOLUTIONS INC has 77 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jul 28, 2021 to Aug 11, 2026), most of them in El Dorado County (60), Placer County (6) and Amador County (3). CSLB lists license 1076337 (DIAMOND SOLAR SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
77
Last 24 months
29
Total capacity
663.5 kW DC
Median system size
8.4 kW DC
With battery storage
48.1% all time; 82.8% last 24 months
Third-party owned
0.0% of 77 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
37 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
Median battery size
20.5 kWh (6 installs list a capacity)
First install
Jul 28, 2021
Latest install
Aug 11, 2026
Counties
7
Utilities
PGE 77
CSLB license
1076337

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202120
2022101
2023213
20242215
2025129
2026 (through Aug 31, 2026)109

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

37 of its 77 interconnected installs (48.7% of the 76 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.067.9%not counted
NEM 2.03343.4%3 (9.1%)
Net Billing Tariff3748.7%30 (81.1%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on DIAMOND SOLAR SOLUTIONS INC’s installs. No residential system in the file lists a third-party owner name that matches DIAMOND SOLAR SOLUTIONS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of DIAMOND SOLAR SOLUTIONS INC’s 29 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 28.6%) used modules recorded as Qcells.

In the last 24 months, 29 of DIAMOND SOLAR SOLUTIONS INC’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 69.0%) used inverters recorded as Enphase.

In the last 24 months, 14 of DIAMOND SOLAR SOLUTIONS INC’s 29 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used batteries recorded as FranklinWH.

24 of 37 battery-paired PG&E and SCE installs (64.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells627
JA Solar55
Hyundai44
REC4not in top list
SolarWorld2not in top list
Inverter makerEnphase2047
FranklinWH1010
Tesla1010
SMA3not in top list
SolarEdge313
Battery makerFranklinWH66
Tesla66
Enphase212

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 77 installs, inverters on 77. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names DIAMOND SOLAR SOLUTIONS INC as developer on 32 battery storage projects and as installer on 30 (30 name it as both), 32 projects in all with 838 kWh of storage. 22 have the status Paid, with $478,064 in current incentive allocations. Applications were received from Mar 7, 2024 to Dec 24, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid22536$478,064
Reserved392$83,152
Pending Reservation126$26,400
Cancelled6182$85,980

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency27715$616,90421$474,104
Small Residential Storage4109$14,9401$3,960
Residential Solar and Storage Equity - AB 209 Non-POU113$41,7520$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076337DIAMOND SOLAR SOLUTIONS INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 28, 2021Apr 30, 202877

License numbers are the ones the utilities recorded on the interconnection applications (77 of 77 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1076337. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado60
Placer6
Amador3
Nevada3
Contra Costa2
Santa Clara2
Yolo1

Top cities

CityInstalls
Placerville26
El Dorado Hills8
Cameron Park5
Diamond Springs5
Pollock Pines4
Georgetown3
Granite Bay3
Shingle Springs3
Concord2
Grass Valley2
Pilot Hill2
Pine Grove2
Auburn1
El Dorado1
Kelsey1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DIAMOND SOLAR SOLUTIONS INC72
DIAMOND SOLAR SOLUTIONS5

Common questions

Where does DIAMOND SOLAR SOLUTIONS INC install solar?

Its installs are spread across 7 counties. The most are in El Dorado County (60 installs), followed by Placer County (6).

How often does DIAMOND SOLAR SOLUTIONS INC install batteries with solar?

48.1% of its interconnected solar installs include battery storage across all years, and 82.8% in the last 24 months (24 of 29).

How many DIAMOND SOLAR SOLUTIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?

37 of its 77 interconnected installs (48.7% of the 76 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.