Sierra Energy Savers

How many solar installs has Sierra Energy Savers done in California, and which license number is on its installs?

Sierra Energy Savers has 121 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Dec 4, 2014 to Apr 14, 2026), most of them in El Dorado County (111), Placer County (5) and Amador County (3). CSLB lists license 852492 (SIERRA ENERGY SAVERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
121
Last 24 months
20
Total capacity
1,080.2 kW DC
Median system size
7.8 kW DC
With battery storage
15.7% all time; 30.0% last 24 months
Third-party owned
0.0% of 121 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Apr 14, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (14 installs list a capacity)
First install
Dec 4, 2014
Latest install
Apr 14, 2026
Counties
4
Utilities
PGE 121
CSLB license
852492

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
201570
2016100
201720
201851
2019111
2020112
2021103
2022194
2023191
202482
2025103
2026 (through Aug 31, 2026)62

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 121 interconnected installs (9.1% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.5% of those include battery storage. The latest Net Billing Tariff install was approved Apr 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02016.5%not counted
NEM 2.09074.4%14 (15.6%)
Net Billing Tariff119.1%5 (45.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sierra Energy Savers’s installs. No residential system in the file lists a third-party owner name that matches Sierra Energy Savers exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of Sierra Energy Savers’ 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 55.0%) used modules recorded as Qcells.

In the last 24 months, 20 of Sierra Energy Savers’ 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 65.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Sierra Energy Savers’ 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Tesla.

14 of 19 battery-paired PG&E and SCE installs (73.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1134
Hyundai2not in top list
LONGi2not in top list
REC210
SolarJuice Technology Inc.2not in top list
Inverter makerEnphase1367
Tesla46
SolarEdge331
Battery makerTesla33
LG24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 116 of 121 installs, inverters on 121. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sierra Energy Savers as developer on 30 battery storage projects and as installer on 30 (30 name it as both), 30 projects in all with 849 kWh of storage. 17 have the status Paid, with $427,768 in current incentive allocations. Applications were received from Jun 24, 2018 to Jul 1, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid17528$427,768
Pending Reservation126$29,040
Cancelled12295$200,472

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency18600$581,65412$400,313
Small Residential Storage9133$24,0154$12,407
Large-Scale Storage290$22,5721$15,048
Residential Solar and Storage Equity - AB 209 Non-POU126$29,0400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
852492SIERRA ENERGY SAVERS (Partnership)CLEARC-10 Electrical ContractorJan 8, 2005Jul 31, 2027121

License numbers are the ones the utilities recorded on the interconnection applications (121 of 121 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 852492. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado111
Placer5
Amador3
Butte2

Top cities

CityInstalls
Placerville33
Shingle Springs19
El Dorado11
El Dorado Hills10
Lotus9
Garden Valley5
Rescue5
Cameron Park3
Camino3
Coloma3
Somerset3
Chico2
Georgetown2
Kelsey2
Lincoln2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SIERRA ENERGY SAVERS80
Sierra Energy Savers40
Sierra Energy savers1

Common questions

Where does Sierra Energy Savers install solar?

Its installs are spread across 4 counties. The most are in El Dorado County (111 installs), followed by Placer County (5).

How often does Sierra Energy Savers install batteries with solar?

15.7% of its interconnected solar installs include battery storage across all years, and 30.0% in the last 24 months (6 of 20).

How many Sierra Energy Savers installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 121 interconnected installs (9.1% of the 121 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.