SolarHut, LLC

How many solar installs has SolarHut, LLC done in California, and which license number is on its installs?

SolarHut, LLC has 407 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Dec 2, 2011 to Aug 31, 2026), most of them in El Dorado County (360), Placer County (16) and Amador County (8). CSLB lists license 970970 (SOLARHUT LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
407
Last 24 months
58
Total capacity
3,172.1 kW DC
Median system size
7.1 kW DC
With battery storage
18.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 82.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 406 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
63 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
2 kWh (43 installs list a capacity)
First install
Dec 2, 2011
Latest install
Aug 31, 2026
Counties
15
Utilities
PGE 406, SDGE 1
CSLB license
970970

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201240
2013120
2014290
2015300
2016370
2017260
2018260
2019233
2020232
2021333
2022385
2023548
20242614
20252925
2026 (through Aug 31, 2026)1615

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

63 of its 407 interconnected installs (15.5% of the 407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011929.2%not counted
NEM 2.022555.3%24 (10.7%)
Net Billing Tariff6315.5%48 (76.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarHut, LLC’s installs. No residential system in the file lists a third-party owner name that matches SolarHut, LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of SolarHut, LLC’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 28.6%) used modules recorded as LONGi.

In the last 24 months, 58 of SolarHut, LLC’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (41, 70.7%) used inverters recorded as Tesla.

In the last 24 months, 24 of SolarHut, LLC’s 58 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (14, 58.3%) used batteries recorded as Tesla.

40 of 75 battery-paired PG&E and SCE installs (53.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1414
Solar4America Technology Inc.9not in top list
Mission Solar7not in top list
Qcells681
Hyundai5not in top list
Inverter makerTesla4148
Enphase17177
SMA695
FranklinWH5not in top list
SunPower494
Battery makerTesla1416
FranklinWH56
Enphase48
Sigenergy1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 341 of 407 installs, inverters on 407. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SolarHut, LLC as developer on 42 battery storage projects and as installer on 39 (39 name it as both), 42 projects in all with 1,074 kWh of storage. 38 have the status Paid, with $917,984 in current incentive allocations. Applications were received from May 1, 2020 to Dec 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid38976$917,984
Reserved145$40,800
Cancelled353$52,800

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency411,034$1,002,88437$909,284
Large-Scale Storage140$8,7001$8,700

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970970SOLARHUT LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 16, 2012Jul 31, 2028386

License numbers are the ones the utilities recorded on the interconnection applications (386 of 407 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970970. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado360
Placer16
Amador8
San Mateo5
Santa Clara3
Santa Cruz3
Contra Costa2
San Joaquin2
Sonoma2
Marin1
Monterey1
Napa1
San Diego1
Santa Barbara1
Solano1

Top cities

CityInstalls
Placerville141
Cameron Park44
Shingle Springs41
El Dorado Hills40
Camino23
El Dorado22
Rescue9
Diamond Springs8
Rocklin7
Somerset7
Grizzly Flats5
Kelsey4
Cool3
Newcastle3
Plymouth3

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARHUT LLC222
SolarHut, LLC140
SolarHut LLC24
SolarHut13
SolarHut,LLC2
Solarhut1
SolarHut Inc1
SoLarHut LLC1
Solarhut, LLC1
SolarHut, LLC.1
SolarHut. LLC1

Common questions

Where does SolarHut, LLC install solar?

Its installs are spread across 15 counties. The most are in El Dorado County (360 installs), followed by Placer County (16).

How often does SolarHut, LLC install batteries with solar?

18.5% of its interconnected solar installs include battery storage across all years, and 82.8% in the last 24 months (48 of 58). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SolarHut, LLC installs are under NEM 3.0 (the Net Billing Tariff)?

63 of its 407 interconnected installs (15.5% of the 407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.