How many solar installs has SOLARWORX INC done in California, and which license number is on its installs?

SOLARWORX INC has 503 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jun 27, 2019 to Jun 1, 2026), most of them in Tuolumne County (451), Calaveras County (35) and Mariposa County (7). CSLB lists license 1062195 (ROOFXPERTS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to SOLARWORX INC here carry more than one CSLB license number: 1062195 on 491 (CSLB holder ROOFXPERTS, Standard) and 926920 on 11 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
503
Last 24 months
28
Total capacity
4,963.7 kW DC
Median system size
9.6 kW DC
With battery storage
1.8% all time; 0.0% last 24 months
Third-party owned
0.2% of 503 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jun 1, 2026
Ownership types recorded
PPA 1
First install
Jun 27, 2019
Latest install
Jun 1, 2026
Counties
7
Utilities
PGE 503
CSLB license
1062195, 926920

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019110
2020290
2021670
20221281
20232193
2024255
2025130
2026 (through Aug 31, 2026)110

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 503 interconnected installs (4.2% of the 503 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those include battery storage. The latest Net Billing Tariff install was approved Jun 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.048295.8%1 (0.2%)
Net Billing Tariff214.2%8 (38.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SOLARWORX INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SOLARWORX INC exactly.

Third-party owner named on its installsInstalls
Sunrun Inc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of SOLARWORX INC’s 28 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 85.2%) used modules recorded as CertainTeed.

In the last 24 months, 28 of SOLARWORX INC’s 28 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of SOLARWORX INC’s 28 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed23226
Silfab2not in top list
Aptos Solar188
JinkoSolar1not in top list
Inverter makerEnphase28376
SolarEdge1128
Battery makerEnphase09

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 493 of 503 installs, inverters on 503. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARWORX INC as developer on 28 battery storage projects and as installer on 28 (28 name it as both), 28 projects in all with 649 kWh of storage. 8 have the status Paid, with $97,427 in current incentive allocations. Applications were received from Jul 11, 2023 to Nov 7, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8106$97,427
Reserved119$19,036
Cancelled19524$126,261

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage17495$122,2270$0
Equity Resiliency8116$115,0357$95,999
Small Residential Storage338$5,4621$1,428

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1062195ROOFXPERTS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJan 9, 2020Jan 31, 2028491
926920Not found in the CSLB License Master file pulled Nov 4, 202611

License numbers are the ones the utilities recorded on the interconnection applications (503 of 503 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1062195. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Tuolumne451
Calaveras35
Mariposa7
Stanislaus6
San Joaquin2
Amador1
Merced1

Top cities

CityInstalls
Sonora263
Jamestown45
Tuolumne36
Twain Harte28
Groveland27
Columbia21
Soulsbyville16
Copperopolis10
Mi Wuk Village9
Angels Camp8
La Grange7
Murphys6
Oakdale6
Arnold4
Vallecito4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARWORX INC481
Solarworx10
SOLARWORX DBA ROOFXPERTS7
solarworx2
Solarworx Inc DBA Roofxperts2
Solarworx dba ROOFXPERTS1

Common questions

Where does SOLARWORX INC install solar?

Its installs are spread across 7 counties. The most are in Tuolumne County (451 installs), followed by Calaveras County (35).

How often does SOLARWORX INC install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 28).

How many SOLARWORX INC installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 503 interconnected installs (4.2% of the 503 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.