Royal Aire, Inc.

How many solar installs has Royal Aire, Inc. done in California, and which license number is on its installs?

Royal Aire, Inc. has 1,148 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Sep 17, 2012 to Aug 17, 2026), most of them in Butte County (993), Glenn County (72) and Tehama County (44). CSLB lists license 510286 (ROYAL AIRE INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-10, C-20, C-36, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,148
Last 24 months
109
Total capacity
7,858.4 kW DC
Median system size
6.2 kW DC
With battery storage
8.1% all time; 73.4% last 24 months
Third-party owned
0.1% of 1,148 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
97 installs, latest Aug 17, 2026
Ownership types recorded
lease 1
Median battery size
1 kWh (44 installs list a capacity)
First install
Sep 17, 2012
Latest install
Aug 17, 2026
Counties
11
Utilities
PGE 1,148
CSLB license
510286

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201350
2014270
2015720
20161250
20171220
2018970
20191230
20201020
20211145
2022391
20231961
20243018
20255747
2026 (through Aug 31, 2026)3821

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

97 of its 1,148 interconnected installs (8.4% of the 1,148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.023520.5%not counted
NEM 2.081671.1%7 (0.9%)
Net Billing Tariff978.4%86 (88.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Royal Aire, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Royal Aire, Inc. exactly.

Third-party owner named on its installsInstalls
SolarCity1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 99 of Royal Aire, Inc.’s 109 installs name a module maker in the “Generator Manufacturer” fields, and most of those (60, 60.6%) used modules recorded as Znshine.

In the last 24 months, 109 of Royal Aire, Inc.’s 109 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (66, 60.6%) used inverters recorded as Enphase.

In the last 24 months, 70 of Royal Aire, Inc.’s 109 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (36, 51.4%) used batteries recorded as Enphase.

82 of 93 battery-paired PG&E and SCE installs (88.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine6060
Wyone Trading33190
Qcells3121
JA Solar1not in top list
Mission Solar1not in top list
Inverter makerEnphase661,064
Tesla4444
SMA17
SolarEdge18
SunPower1not in top list
Battery makerEnphase3648
Tesla3434

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,089 of 1,148 installs, inverters on 1,148. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Royal Aire, Inc. as developer on 11 battery storage projects and as installer on 9 (9 name it as both), 11 projects in all with 178 kWh of storage. 2 have the status Paid, with $20,023 in current incentive allocations. Applications were received from Aug 24, 2020 to Dec 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid220$20,023
Reserved337$62,988
Pending Reservation119$36,999
Cancelled5102$84,363

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency6112$111,2972$20,023
Residential Solar and Storage Equity - AB 209 Non-POU346$90,4690$0
Small Residential Storage219$2,6070$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
510286ROYAL AIRE INC (Corporation)CLEARB General Building Contractor; C-2; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorMay 7, 1987Jul 31, 20281,132

License numbers are the ones the utilities recorded on the interconnection applications (1,134 of 1,148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 510286. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte993
Glenn72
Tehama44
Sutter16
Shasta10
Yuba6
Colusa3
Lake1
Nevada1
Placer1
Sonoma1

Top cities

CityInstalls
Chico762
Oroville98
Paradise61
Orland51
Durham42
Corning20
Magalia15
Willows15
Live Oak12
Red Bluff11
Los Molinos9
Gridley5
Yuba City4
Anderson3
Biggs3

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ROYAL AIRE INC625
Royal Aire, Inc.371
Royal Aire86
Royal Aire, Inc24
Royal Aire Inc.20
Royal Aire Inc18
ROYAL AIRE, INC.3
ROYAL AIRE1

Common questions

Where does Royal Aire, Inc. install solar?

Its installs are spread across 11 counties. The most are in Butte County (993 installs), followed by Glenn County (72).

How often does Royal Aire, Inc. install batteries with solar?

8.1% of its interconnected solar installs include battery storage across all years, and 73.4% in the last 24 months (80 of 109).

How many Royal Aire, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

97 of its 1,148 interconnected installs (8.4% of the 1,148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.