North State Solar Energy has 524 residential solar installs interconnected in California, active in the records from 2011 through 2025 (Apr 28, 2011 to Dec 5, 2025), most of them in Butte County (204), Colusa County (107) and Glenn County (79). CSLB lists license 813508 (NORTH STATE SOLAR ENERGY CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
524
Last 24 months
1
Total capacity
4,442.5 kW DC
Median system size
7.8 kW DC
With battery storage
0.6% all time; 0.0% last 24 months
Third-party owned
0.2% of 524 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 5, 2025
Ownership types recorded
lease 1
First install
Apr 28, 2011
Latest install
Dec 5, 2025
Counties
18
Utilities
PGE 524
CSLB license
813508

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201290
2013650
2014720
2015990
20161220
2017481
2018641
2019341
202040
202100
202200
202310
202430
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 524 interconnected installs (0.2% of the 524 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 5, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.037471.4%not counted
NEM 2.014928.4%3 (2.0%)
Net Billing Tariff10.2%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of North State Solar Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches North State Solar Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
North State Solar Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of North State Solar Energy’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Solar4America Technology Inc..

In the last 24 months, 1 of North State Solar Energy’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

0 of 3 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolar4America Technology Inc.1not in top list
Inverter makerEnphase1433

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 470 of 524 installs, inverters on 524. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names North State Solar Energy as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 20 kWh of storage. 3 have the status Paid, with $4,688 in current incentive allocations. Applications were received from Jun 5, 2017 to Jul 14, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid317$4,688
Cancelled14$996

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage420$5,6843$4,688

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
813508NORTH STATE SOLAR ENERGY CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 10, 2002Oct 31, 2028404

License numbers are the ones the utilities recorded on the interconnection applications (406 of 524 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 813508. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte204
Colusa107
Glenn79
Sutter29
Yolo29
Tehama24
Shasta18
Yuba9
Mendocino7
Placer4
Sonoma4
El Dorado3
San Joaquin2
Marin1
Nevada1
Plumas1
Sacramento1
Stanislaus1

Top cities

CityInstalls
Chico89
Oroville54
Colusa53
Gridley31
Orland27
Glenn26
Williams22
Red Bluff19
Willows19
Woodland19
Arbuckle16
Yuba City15
Biggs11
Cottonwood11
Live Oak8

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
North State Solar Energy520
NORTH STATE SOLAR ENERGY3
North State Solar energy1

Common questions

Where does North State Solar Energy install solar?

Its installs are spread across 18 counties. The most are in Butte County (204 installs), followed by Colusa County (107).

How often does North State Solar Energy install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many North State Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 524 interconnected installs (0.2% of the 524 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.