Chico Electric has 658 residential solar installs interconnected in California, active in the records from 2001 through 2025 (Jul 27, 2001 to Dec 5, 2025), most of them in Butte County (457), Glenn County (67) and Tehama County (47). CSLB lists license 454345 (CHICO ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
658
Last 24 months
16
Total capacity
5,639 kW DC
Median system size
7.2 kW DC
With battery storage
1.4% all time; 12.5% last 24 months
Third-party owned
0.2% of 658 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Jul 23, 2025
Ownership types recorded
lease 1
Median battery size
14 kWh (4 installs list a capacity)
First install
Jul 27, 2001
Latest install
Dec 5, 2025
Counties
15
Utilities
PGE 658
CSLB license
454345

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200110
200200
200300
200400
200530
200600
200720
200800
200980
2010110
2011120
2012180
2013260
2014350
2015390
2016380
2017410
2018801
2019870
2020712
2021692
2022450
2023451
2024152
2025121
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 658 interconnected installs (1.5% of the 658 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 23, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020030.4%not counted
NEM 2.044868.1%5 (1.1%)
Net Billing Tariff101.5%3 (30.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Chico Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Chico Electric exactly.

Third-party owner named on its installsInstalls
CE Energy Leasing LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of Chico Electric’s 16 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 93.3%) used modules recorded as Qcells.

In the last 24 months, 16 of Chico Electric’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of Chico Electric’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

5 of 9 battery-paired PG&E and SCE installs (55.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1462
LONGi1not in top list
Inverter makerEnphase12272
SMA5159
Battery makerEnphase23

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 594 of 658 installs, inverters on 658. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Chico Electric as developer on 8 battery storage projects and as installer on 5 (4 name it as both), 9 projects in all with 4,159 kWh of storage. 3 have the status Paid, with $606,980 in current incentive allocations. Applications were received from Feb 23, 2016 to Jul 5, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid31,238$606,980
Cancelled52,596$894,518
RRF Rejected1325$103,443

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage62,906$995,2971$100,779
Small Residential Storage116$6,1961$6,196
Not stated21,237$603,4491$500,006

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
454345CHICO ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 1, 1984Apr 30, 2028552

License numbers are the ones the utilities recorded on the interconnection applications (557 of 658 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 454345. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Butte457
Glenn67
Tehama47
Sutter37
Colusa15
San Joaquin15
Shasta7
Placer4
Nevada2
Plumas2
Calaveras1
Contra Costa1
Mendocino1
Sacramento1
Yolo1

Top cities

CityInstalls
Chico368
Durham30
Orland30
Yuba City25
Paradise24
Red Bluff24
Oroville21
Willows21
Maxwell12
Stockton11
Glenn10
Corning9
Live Oak9
Gridley7
Los Molinos7

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Chico Electric286
CHICO ELECTRIC276
chico electric63
Chico Electric Company16
CHICO ELECTRIC INC9
Chico electric4
Chico Electric company2
Chico Electric Co.1
Chico electric Company1

Common questions

Where does Chico Electric install solar?

Its installs are spread across 15 counties. The most are in Butte County (457 installs), followed by Glenn County (67).

How often does Chico Electric install batteries with solar?

1.4% of its interconnected solar installs include battery storage across all years, and 12.5% in the last 24 months (2 of 16).

How many Chico Electric installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 658 interconnected installs (1.5% of the 658 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 30.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.