Alternative Energy Systems, Inc.

How many solar installs has Alternative Energy Systems, Inc. done in California, and which license number is on its installs?

Alternative Energy Systems, Inc. has 3,127 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Jan 11, 2006 to Aug 21, 2026), most of them in Butte County (2,117), Tehama County (295) and Glenn County (257). CSLB lists license 853351 (ALTERNATIVE ENERGY SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Alternative Energy Systems, Inc. here carry more than one CSLB license number: 853351 on 2,830 (CSLB holder ALTERNATIVE ENERGY SYSTEMS INC, Chico) and 835531 on 54 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
3,127
Last 24 months
147
Total capacity
25,973.4 kW DC
Median system size
7.5 kW DC
With battery storage
4.4% all time; 61.2% last 24 months
Third-party owned
0.5% of 3,127 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
98 installs, latest Aug 21, 2026
Ownership types recorded
PPA 15, lease 1
Median battery size
13.5 kWh (55 installs list a capacity)
First install
Jan 11, 2006
Latest install
Aug 21, 2026
Counties
13
Utilities
PGE 3,127
CSLB license
853351, 835531

Is Alternative Energy Systems, Inc. still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (56 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200650
2007230
2008230
2009290
2010290
2011530
2012460
2013310
20141260
20152970
20163570
20172890
20182351
20192517
202020412
20212513
20222942
20233074
202415329
202510164
2026 (through Aug 31, 2026)2316

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

98 of its 3,127 interconnected installs (3.1% of the 3,127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,03933.2%not counted
NEM 2.01,99063.6%40 (2.0%)
Net Billing Tariff983.1%86 (87.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 16 of Alternative Energy Systems, Inc.’s installs the utility recorded a third-party ownership type: PPA 15, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Alternative Energy Systems, Inc. exactly.

Third-party owner named on its installsInstalls
AES9
Lightreach5
Concert Propel1
Sunlight Capital1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 125 of Alternative Energy Systems, Inc.’s 147 installs name a module maker in the “Generator Manufacturer” fields, and most of those (96, 76.8%) used modules recorded as Qcells.

In the last 24 months, 147 of Alternative Energy Systems, Inc.’s 147 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (78, 53.1%) used inverters recorded as Enphase.

In the last 24 months, 67 of Alternative Energy Systems, Inc.’s 147 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (53, 79.1%) used batteries recorded as Tesla.

97 of 138 battery-paired PG&E and SCE installs (70.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells96334
JinkoSolar13not in top list
SunPower91,910
Boviet Solar Technology5not in top list
REC4518
Inverter makerEnphase781,154
Tesla77124
SunPower151,380
SMA10629
Fronius2not in top list
Battery makerTesla5371
Enphase1426

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,875 of 3,127 installs, inverters on 3,127. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Alternative Energy Systems, Inc. as developer on 151 battery storage projects and as installer on 149 (149 name it as both), 151 projects in all with 3,841 kWh of storage. 105 have the status Paid, with $1,192,781 in current incentive allocations. Applications were received from Jul 25, 2018 to Nov 28, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1052,600$1,192,781
Cancelled441,188$301,216
RRF Rejected253$7,440

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1032,468$460,91271$332,832
Equity Resiliency37950$941,90933$849,509
Large-Scale Storage9370$91,1761$10,440
Not stated253$7,4400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
853351ALTERNATIVE ENERGY SYSTEMS INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJan 21, 2005Jan 31, 20272,830
835531Not found in the CSLB License Master file pulled Nov 4, 202654

License numbers are the ones the utilities recorded on the interconnection applications (2,888 of 3,127 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853351. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Butte2,117
Tehama295
Glenn257
Sutter154
Shasta146
Yuba96
Colusa22
Placer16
Yolo10
Nevada9
El Dorado2
Solano2
Plumas1

Top cities

CityInstalls
Chico1,632
Oroville190
Orland174
Paradise136
Yuba City127
Red Bluff115
Corning104
Durham84
Willows64
Marysville55
Cottonwood54
Redding50
Gridley35
Anderson34
Los Molinos22

Names as recorded by the utilities

The utilities recorded this installer under 17 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALTERNATIVE ENERGY SYSTEMS INC1,487
ALTERNATIVE ENERGY SYSTEMS, INC.665
Alternative Energy Systems, Inc.614
ALTERNATIVE ENERGY SYSTEMS, INC113
Alternative Energy Systems75
Alternative Energy Systems Inc.70
Alternative Energy Systems Inc33
ALTERNATIVE ENERGY SYSTEMS, INC,26
Alternative Energy Systems, Inc22
ALTERNATIVE ENERGY SYSTEMS INC.12
ALTERNATIVE ENERGY SYSTEMS3
Alternative Energy Systems INC2
Alternative Energy Systems, INC1
Alternative Energy Systems, Inc,1
Alternative Energy Systems, inc.1
Alternative Energy Systems. Inc.1
Alternative Energy Systems., Inc.1

Common questions

Where does Alternative Energy Systems, Inc. install solar?

Its installs are spread across 13 counties. The most are in Butte County (2,117 installs), followed by Tehama County (295).

How often does Alternative Energy Systems, Inc. install batteries with solar?

4.4% of its interconnected solar installs include battery storage across all years, and 61.2% in the last 24 months (90 of 147).

How many Alternative Energy Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

98 of its 3,127 interconnected installs (3.1% of the 3,127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.