Solectric

How many solar installs has Solectric done in California, and which license number is on its installs?

Solectric has 202 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Oct 17, 2006 to Jul 29, 2026), most of them in Yolo County (135), Placer County (17) and El Dorado County (16). CSLB lists license 1013576 (SOLECTRIC CORP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
202
Last 24 months
23
Total capacity
1,345.8 kW DC
Median system size
6.1 kW DC
With battery storage
10.4% all time; 56.5% last 24 months
Third-party owned
2.0% of 202 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
31 installs, latest Jul 29, 2026
Ownership types recorded
lease 4
First install
Oct 17, 2006
Latest install
Jul 29, 2026
Counties
14
Utilities
PGE 202
CSLB license
1013576

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200700
200800
200900
201000
201100
201200
201300
201400
201500
201650
201780
2018210
2019150
2020160
2021171
2022453
2023454
2024102
202596
2026 (through Aug 31, 2026)105

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

31 of its 202 interconnected installs (15.3% of the 202 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.2% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.073.5%not counted
NEM 2.016481.2%7 (4.3%)
Net Billing Tariff3115.3%14 (45.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of Solectric’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Solectric exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower3
Solectric1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 22 of Solectric’s 23 installs name a module maker in the “Generator Manufacturer” fields, and most of those (15, 68.2%) used modules recorded as Qcells.

In the last 24 months, 23 of Solectric’s 23 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 69.6%) used inverters recorded as Enphase.

In the last 24 months, 9 of Solectric’s 23 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used batteries recorded as Tesla.

14 of 21 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1516
SunPower499
REC311
General Electric1not in top list
JA Solar1not in top list
Inverter makerEnphase16111
Tesla66
Qcells3not in top list
SMA247
Xantrex Technology Inc.1not in top list
Battery makerTesla66
Enphase33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 194 of 202 installs, inverters on 202. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solectric as developer on 5 battery storage projects and as installer on 5 (5 name it as both), 5 projects in all with 119 kWh of storage. 4 have the status Paid, with $105,600 in current incentive allocations. Applications were received from Jul 4, 2023 to Jul 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4106$105,600
Reserved113$13,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency5119$118,8004$105,600

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1013576SOLECTRIC CORP (Corporation)CLEARC-10 Electrical ContractorApr 30, 2016May 31, 2028198

License numbers are the ones the utilities recorded on the interconnection applications (201 of 202 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1013576. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Yolo135
Placer17
El Dorado16
Alameda12
Solano8
San Joaquin5
Santa Clara2
Butte1
Colusa1
Contra Costa1
Lake1
Nevada1
San Mateo1
Sutter1

Top cities

CityInstalls
West Sacramento82
Davis36
El Dorado Hills13
Woodland12
Granite Bay6
Lincoln6
Livermore6
Dixon4
Oakland4
Rocklin4
Winters4
Fairfield3
Placerville3
Stockton3
El Macero2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLECTRIC133
Solectric28
SOLECTRIC CORP22
solectric19

Common questions

Where does Solectric install solar?

Its installs are spread across 14 counties. The most are in Yolo County (135 installs), followed by Placer County (17).

How often does Solectric install batteries with solar?

10.4% of its interconnected solar installs include battery storage across all years, and 56.5% in the last 24 months (13 of 23).

How many Solectric installs are under NEM 3.0 (the Net Billing Tariff)?

31 of its 202 interconnected installs (15.3% of the 202 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 45.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.