How many solar installs has Aztec Solar Inc done in California, and which license number is on its installs?

Aztec Solar Inc has 777 residential solar installs interconnected in California, active in the records from 2007 through 2026 (May 9, 2007 to Aug 19, 2026), most of them in El Dorado County (195), Placer County (189) and Yolo County (126). CSLB lists license 550110 (AZTEC SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
777
Last 24 months
78
Total capacity
6,014.4 kW DC
Median system size
7.2 kW DC
With battery storage
12.9% all time; 71.8% last 24 months
Third-party owned
0.6% of 777 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
106 installs, latest Aug 19, 2026
Ownership types recorded
PPA 5
Median battery size
13.5 kWh (32 installs list a capacity)
First install
May 9, 2007
Latest install
Aug 19, 2026
Counties
19
Utilities
PGE 777
CSLB license
550110

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200730
200800
200900
201070
201120
201220
201330
2014220
2015380
2016370
2017510
2018650
2019762
20208710
2021242
2022751
202316510
20244922
20255442
2026 (through Aug 31, 2026)1711

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

106 of its 777 interconnected installs (13.6% of the 777 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012015.4%not counted
NEM 2.055170.9%29 (5.3%)
Net Billing Tariff10613.6%68 (64.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of Aztec Solar Inc’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Aztec Solar Inc exactly.

Third-party owner named on its installsInstalls
HDM Capital LLC5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 68 of Aztec Solar Inc’s 78 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 64.7%) used modules recorded as JinkoSolar.

In the last 24 months, 78 of Aztec Solar Inc’s 78 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (48, 61.5%) used inverters recorded as Enphase.

In the last 24 months, 50 of Aztec Solar Inc’s 78 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (18, 36.0%) used batteries recorded as PointGuard Energy Inc..

86 of 100 battery-paired PG&E and SCE installs (86.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar44not in top list
REC1483
Canadian Solar596
SolarJuice Technology Inc.4120
Mission Solar2not in top list
Inverter makerEnphase48337
PointGuard Energy Inc.19not in top list
Tesla1928
FranklinWH1023
SolarEdge7347
Battery makerPointGuard Energy Inc.1820
Tesla1522
FranklinWH1020
Enphase69
SolarEdge1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 705 of 777 installs, inverters on 777. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Aztec Solar Inc as developer on 44 battery storage projects and as installer on 42 (41 name it as both), 45 projects in all with 1,092 kWh of storage. 22 have the status Paid, with $185,698 in current incentive allocations. Applications were received from Jun 5, 2017 to Dec 16, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid22368$185,698
Cancelled21678$273,734
RRF Rejected246$7,040

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage27425$68,64916$37,130
Equity Resiliency13310$280,9786$148,568
Large-Scale Storage3311$109,8050$0
Not stated246$7,0400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
550110AZTEC SOLAR INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 5, 1988Jun 30, 2028759

License numbers are the ones the utilities recorded on the interconnection applications (760 of 777 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 550110. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado195
Placer189
Yolo126
San Joaquin90
Solano62
Yuba23
Amador16
Nevada16
Sutter16
Contra Costa15
Calaveras9
Colusa5
Sacramento4
Napa3
Stanislaus3
San Mateo2
Butte1
Sonoma1
Tuolumne1

Top cities

CityInstalls
El Dorado Hills96
Rocklin51
Stockton45
Davis44
West Sacramento42
Granite Bay41
Lincoln36
Auburn32
Woodland27
Cameron Park24
Vacaville23
Placerville22
Shingle Springs18
Loomis17
Yuba City16

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AZTEC SOLAR INC491
Aztec Solar Inc265
Aztec Solar11
Aztec Solar Inc.6
AZTEC SOLAR2
Aztec solar1
AZTEC Solar Inc1

Common questions

Where does Aztec Solar Inc install solar?

Its installs are spread across 19 counties. The most are in El Dorado County (195 installs), followed by Placer County (189).

How often does Aztec Solar Inc install batteries with solar?

12.9% of its interconnected solar installs include battery storage across all years, and 71.8% in the last 24 months (56 of 78).

How many Aztec Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

106 of its 777 interconnected installs (13.6% of the 777 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.