Sun Up Electric Inc.

How many solar installs has Sun Up Electric Inc. done in California, and which license number is on its installs?

Sun Up Electric Inc. has 183 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jan 4, 2018 to Jul 30, 2026), most of them in Placer County (76), El Dorado County (34) and Yolo County (20). CSLB lists license 1010469 (SUN UP ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
183
Last 24 months
69
Total capacity
1,556 kW DC
Median system size
7.6 kW DC
With battery storage
31.7% all time; 55.1% last 24 months
Third-party owned
0.0% of 183 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
81 installs, latest Jun 10, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (3 installs list a capacity)
First install
Jan 4, 2018
Latest install
Jul 30, 2026
Counties
16
Utilities
PGE 183
CSLB license
1010469

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201870
2019100
2020130
2021100
2022201
2023305
20244427
20253217
2026 (through Aug 31, 2026)178

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

81 of its 183 interconnected installs (44.3% of the 183 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 59.3% of those include battery storage. The latest Net Billing Tariff install was approved Jun 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021.1%not counted
NEM 2.010054.6%10 (10.0%)
Net Billing Tariff8144.3%48 (59.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sun Up Electric Inc.’s installs. No residential system in the file lists a third-party owner name that matches Sun Up Electric Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 65 of Sun Up Electric Inc.’s 69 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 60.0%) used modules recorded as Qcells.

In the last 24 months, 69 of Sun Up Electric Inc.’s 69 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (45, 65.2%) used inverters recorded as Enphase.

In the last 24 months, 33 of Sun Up Electric Inc.’s 69 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 57.6%) used batteries recorded as Tesla.

52 of 58 battery-paired PG&E and SCE installs (89.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells39109
LONGi1520
JA Solar5not in top list
Canadian Solar49
Aptos Solar2not in top list
Inverter makerEnphase45144
Tesla2225
FranklinWH45
SolarEdge417
ABB1not in top list
Battery makerTesla1922
Enphase1025
FranklinWH45

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 176 of 183 installs, inverters on 183. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sun Up Electric Inc. as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 63 kWh of storage. 1 have the status Paid, with $9,450 in current incentive allocations. Applications were received from Sep 20, 2022 to Sep 22, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$9,450
Cancelled253$31,152

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency236$35,8501$9,450
Large-Scale Storage126$4,7520$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1010469SUN UP ELECTRIC INC (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorJan 21, 2016Jan 31, 2028182

License numbers are the ones the utilities recorded on the interconnection applications (182 of 183 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1010469. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer76
El Dorado34
Yolo20
Butte12
Contra Costa8
Yuba7
Nevada6
Solano5
Santa Clara4
Sutter3
Sacramento2
San Mateo2
Alameda1
Marin1
Napa1
Sonoma1

Top cities

CityInstalls
El Dorado Hills18
Granite Bay17
Lincoln16
Auburn14
Paradise12
West Sacramento9
Loomis8
Woodland7
Newcastle6
Shingle Springs6
Meadow Vista5
Cameron Park4
Rocklin4
Browns Valley3
Foresthill3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUN UP ELECTRIC INC109
Sun Up Electric Inc.51
Sun Up Electric18
Sun Up Electric Inc2
Sun Up Electric, Inc.2
Sun-Up Electric1

Common questions

Where does Sun Up Electric Inc. install solar?

Its installs are spread across 16 counties. The most are in Placer County (76 installs), followed by El Dorado County (34).

How often does Sun Up Electric Inc. install batteries with solar?

31.7% of its interconnected solar installs include battery storage across all years, and 55.1% in the last 24 months (38 of 69).

How many Sun Up Electric Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

81 of its 183 interconnected installs (44.3% of the 183 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 59.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.