How many solar installs has AMERISUN done in California, and which license number is on its installs?

AMERISUN has 701 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Dec 19, 2019 to Jun 3, 2026), most of them in San Joaquin County (100), Placer County (80) and Contra Costa County (79). The license number recorded on most of its installs, 784754, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
701
Last 24 months
19
Total capacity
5,827.1 kW DC
Median system size
7.5 kW DC
With battery storage
22.3% all time; 36.8% last 24 months
Third-party owned
0.0% of 701 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
181 installs, latest Apr 23, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (55 installs list a capacity)
First install
Dec 19, 2019
Latest install
Jun 3, 2026
Counties
39
Utilities
PGE 666, SCE 35
CSLB license
784754

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
2020240
2021923
20222160
202319334
2024162115
2025113
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

181 of its 701 interconnected installs (25.8% of the 701 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.1% of those include battery storage. The latest Net Billing Tariff install was approved Apr 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.052074.2%20 (3.8%)
Net Billing Tariff18125.8%136 (75.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AMERISUN’s installs. Across all installers, 1 residential systems list a third-party owner name that matches AMERISUN exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 17 of AMERISUN’s 19 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 47.1%) used modules recorded as JinkoSolar.

In the last 24 months, 19 of AMERISUN’s 19 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 89.5%) used inverters recorded as Enphase.

In the last 24 months, 7 of AMERISUN’s 19 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 85.7%) used batteries recorded as Enphase.

134 of 156 battery-paired PG&E and SCE installs (85.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar8292
Canadian Solar238
LONGi2not in top list
Qcells2162
Bluesun Solar1not in top list
Inverter makerEnphase17477
SolarEdge2246
PointGuard Energy Inc.1not in top list
SunPower19
Battery makerEnphase6102
LG124

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 591 of 701 installs, inverters on 701. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AMERISUN as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 39 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Dec 11, 2023 to Mar 2, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled239$22,324

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$19,4120$0
Small Residential Storage119$2,9120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
784754Not found in the CSLB License Master file pulled Nov 4, 2026701

License numbers are the ones the utilities recorded on the interconnection applications (701 of 701 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list AMERISUN’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
City and County of San Francisco78475422

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Joaquin100
Placer80
Contra Costa79
Solano69
El Dorado41
Butte40
Yolo37
Sutter27
Alameda26
Yuba24
Nevada23
Sonoma20
San Bernardino19
Napa15
Calaveras11
Humboldt9
Santa Clara9
Amador8
Lake8
Riverside7
Tehama7
Los Angeles6
Tuolumne5
Fresno3
Glenn3
Madera3
Merced3
San Benito3
San Mateo3
Shasta3
Colusa2
Marin1
Monterey1
Orange1
Sacramento1
San Francisco1
San Luis Obispo1
Tulare1
Ventura1

Top cities

CityInstalls
Stockton74
Auburn24
Woodland24
Vacaville23
Lincoln20
Yuba City20
Antioch19
Fairfield17
Vallejo16
Grass Valley15
Oroville15
Santa Rosa15
Oakland14
Chico13
Rocklin13

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMERISUN700
Amerisun1

Common questions

Where does AMERISUN install solar?

Its installs are spread across 39 counties. The most are in San Joaquin County (100 installs), followed by Placer County (80).

How often does AMERISUN install batteries with solar?

22.3% of its interconnected solar installs include battery storage across all years, and 36.8% in the last 24 months (7 of 19).

How many AMERISUN installs are under NEM 3.0 (the Net Billing Tariff)?

181 of its 701 interconnected installs (25.8% of the 701 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources