EAST BAY POWER SYSTEMS LLC

How many solar installs has EAST BAY POWER SYSTEMS LLC done in California, and which license number is on its installs?

EAST BAY POWER SYSTEMS LLC has 126 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jan 25, 2023 to Aug 27, 2026), most of them in Contra Costa County (67), Alameda County (44) and San Mateo County (5). CSLB lists license 1098150 (EAST BAY POWER SYSTEMS LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
126
Last 24 months
85
Total capacity
953.5 kW DC
Median system size
7.4 kW DC
With battery storage
70.6% all time; 97.6% last 24 months
Third-party owned
0.8% of 126 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
82 installs, latest Aug 27, 2026
Ownership types recorded
lease 1
Median battery size
13.8 kWh (80 installs list a capacity)
First install
Jan 25, 2023
Latest install
Aug 27, 2026
Counties
6
Utilities
PGE 126
CSLB license
1098150

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023311
20242014
20253635
2026 (through Aug 31, 2026)3939

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

82 of its 126 interconnected installs (65.1% of the 126 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032.4%not counted
NEM 2.04132.5%7 (17.1%)
Net Billing Tariff8265.1%79 (96.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of EAST BAY POWER SYSTEMS LLC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches EAST BAY POWER SYSTEMS LLC exactly.

Third-party owner named on its installsInstalls
Eastbay Power Systems1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 82 of EAST BAY POWER SYSTEMS LLC’s 85 installs name a module maker in the “Generator Manufacturer” fields, and most of those (60, 73.2%) used modules recorded as Hyundai.

In the last 24 months, 85 of EAST BAY POWER SYSTEMS LLC’s 85 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (75, 88.2%) used inverters recorded as Tesla.

In the last 24 months, 72 of EAST BAY POWER SYSTEMS LLC’s 85 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (64, 88.9%) used batteries recorded as Tesla.

77 of 89 battery-paired PG&E and SCE installs (86.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai6063
JA Solar1111
Mission Solar310
REC37
Aptos Solar2not in top list
Inverter makerTesla7581
Enphase943
PointGuard Energy Inc.55
SMA22
FranklinWH1not in top list
Battery makerTesla6469
PointGuard Energy Inc.55
Enphase22
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 121 of 126 installs, inverters on 126. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names EAST BAY POWER SYSTEMS LLC as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 58 kWh of storage. 2 have the status Paid, with $41,094 in current incentive allocations. Applications were received from Dec 13, 2024 to Jul 11, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid226$41,094
Reserved231$21,711

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU231$47,6251$27,894
Equity Resiliency113$13,2001$13,200
Small Residential Storage113$1,9800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1098150EAST BAY POWER SYSTEMS LLC (Limited Liability)CLEARC-10 Electrical ContractorOct 26, 2022Oct 31, 2028126

License numbers are the ones the utilities recorded on the interconnection applications (126 of 126 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1098150. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa67
Alameda44
San Mateo5
Solano5
Santa Clara4
Marin1

Top cities

CityInstalls
Oakland22
Walnut Creek10
Berkeley7
Pleasant Hill7
Concord6
Danville6
Lafayette6
Martinez6
San Ramon5
Fairfield4
Orinda4
Castro Valley3
San Jose3
Albany2
Antioch2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EAST BAY POWER SYSTEMS LLC126

Common questions

Where does EAST BAY POWER SYSTEMS LLC install solar?

Its installs are spread across 6 counties. The most are in Contra Costa County (67 installs), followed by Alameda County (44).

How often does EAST BAY POWER SYSTEMS LLC install batteries with solar?

70.6% of its interconnected solar installs include battery storage across all years, and 97.6% in the last 24 months (83 of 85).

How many EAST BAY POWER SYSTEMS LLC installs are under NEM 3.0 (the Net Billing Tariff)?

82 of its 126 interconnected installs (65.1% of the 126 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.