How many solar installs has Diablo Solar Services done in California, and which license number is on its installs?

Diablo Solar Services has 1,835 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Feb 4, 2003 to Aug 20, 2026), most of them in Contra Costa County (1,316), Alameda County (310) and Solano County (84). CSLB lists license 454228 (DIABLO SOLAR SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,835
Last 24 months
124
Total capacity
19,643.9 kW DC
Median system size
6.4 kW DC
With battery storage
11.8% all time; 90.3% last 24 months
Third-party owned
0.0% of 1,835 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
95 installs, latest Aug 20, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (158 installs list a capacity)
First install
Feb 4, 2003
Latest install
Aug 20, 2026
Counties
10
Utilities
PGE 1,835
CSLB license
454228

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200350
2004110
2005120
2006120
2007130
2008200
2009600
2010360
2011480
2012770
20131270
20141210
2015980
2016940
2017860
20181210
20191800
20201318
202111712
202215333
202315927
20245444
20257470
2026 (through Aug 31, 2026)2622

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

95 of its 1,835 interconnected installs (5.2% of the 1,835 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.075941.4%not counted
NEM 2.098153.5%111 (11.3%)
Net Billing Tariff955.2%84 (88.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Diablo Solar Services’s installs. No residential system in the file lists a third-party owner name that matches Diablo Solar Services exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 100 of Diablo Solar Services’ 124 installs name a module maker in the “Generator Manufacturer” fields, and most of those (58, 58.0%) used modules recorded as Silfab.

In the last 24 months, 124 of Diablo Solar Services’ 124 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (109, 87.9%) used inverters recorded as Tesla.

In the last 24 months, 73 of Diablo Solar Services’ 124 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (69, 94.5%) used batteries recorded as Tesla.

137 of 216 battery-paired PG&E and SCE installs (63.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab58223
Hyundai23not in top list
Panasonic6450
Qcells4not in top list
SunPower3218
Inverter makerTesla109148
SolarEdge281,062
Enphase21368
SunPower3213
Fronius1not in top list
Battery makerTesla6998
Enphase33
LG136

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,749 of 1,835 installs, inverters on 1,835. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
454228DIABLO SOLAR SERVICES INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 29, 1984Mar 31, 20281,368

License numbers are the ones the utilities recorded on the interconnection applications (1,371 of 1,835 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 454228. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Diablo Solar Services’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated Marin County45422811

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Contra Costa1,316
Alameda310
Solano84
Napa73
Sonoma20
San Joaquin16
Marin11
Nevada2
Santa Clara2
Merced1

Top cities

CityInstalls
Walnut Creek208
Danville124
Martinez107
Concord104
Alamo98
Lafayette98
Pleasanton89
Brentwood82
Livermore80
San Ramon72
Antioch60
Pleasant Hill58
Moraga57
Orinda53
Clayton52

Names as recorded by the utilities

The utilities recorded this installer under 18 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DIABLO SOLAR SERVICES INC774
Diablo Solar Services563
Diablo Solar Services Inc192
Diablo Solar Services, Inc112
Diablo Solar Services, Inc.102
Diablo Solar Services Inc.40
DIABLO SOLAR SERVICES32
DIABLO SOLAR SERVICES INC.6
DIABLO SOLAR SERVICES, INC3
DIABLO SOLAR SERVICES, INC.3
Diablo solar services1
Diablo Solar services1
Diablo solar Services Inc1
Diablo Solar Services INC1
Diablo solar Services Inc.1
Diablo Solar Services inc.1
Diablo Solar Services LLC1
Diablo solar Services, Inc.1

Common questions

Where does Diablo Solar Services install solar?

Its installs are spread across 10 counties. The most are in Contra Costa County (1,316 installs), followed by Alameda County (310).

How often does Diablo Solar Services install batteries with solar?

11.8% of its interconnected solar installs include battery storage across all years, and 90.3% in the last 24 months (112 of 124).

How many Diablo Solar Services installs are under NEM 3.0 (the Net Billing Tariff)?

95 of its 1,835 interconnected installs (5.2% of the 1,835 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.