Northern Pacific Power Systems, Inc.

How many solar installs has Northern Pacific Power Systems, Inc. done in California, and which license number is on its installs?

Northern Pacific Power Systems, Inc. has 2,233 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Sep 21, 2010 to Aug 21, 2026), most of them in Sonoma County (1,763), Marin County (253) and Napa County (143). CSLB lists license 939082 (NORTHERN PACIFIC POWER SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,233
Last 24 months
531
Total capacity
17,134.4 kW DC
Median system size
6.7 kW DC
With battery storage
32.1% all time; 90.4% last 24 months
Third-party owned
0.1% of 2,233 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
541 installs, latest Aug 21, 2026
Ownership types recorded
PPA 2
Median battery size
2 kWh (444 installs list a capacity)
First install
Sep 21, 2010
Latest install
Aug 21, 2026
Counties
16
Utilities
PGE 2,233
CSLB license
939082

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201050
2011130
2012110
201380
2014330
2015490
2016630
2017620
2018810
20191892
202019217
202123340
202226826
202336754
2024228184
2025283257
2026 (through Aug 31, 2026)148136

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

541 of its 2,233 interconnected installs (24.2% of the 2,233 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02019.0%not counted
NEM 2.01,49166.8%171 (11.5%)
Net Billing Tariff54124.2%533 (98.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Northern Pacific Power Systems, Inc.’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Northern Pacific Power Systems, Inc. exactly.

Third-party owner named on its installsInstalls
ORE Developer Corporate Entity1
Sunrun Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 479 of Northern Pacific Power Systems, Inc.’s 531 installs name a module maker in the “Generator Manufacturer” fields, and most of those (394, 82.3%) used modules recorded as Qcells.

In the last 24 months, 531 of Northern Pacific Power Systems, Inc.’s 531 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (429, 80.8%) used inverters recorded as Tesla.

In the last 24 months, 369 of Northern Pacific Power Systems, Inc.’s 531 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (318, 86.2%) used batteries recorded as Tesla.

560 of 716 battery-paired PG&E and SCE installs (78.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells394641
REC55230
Solaria28354
SolarWorld9not in top list
SunPower9284
Inverter makerTesla429506
Enphase1501,476
FranklinWH17not in top list
SunPower17275
SMA1471
Battery makerTesla318375
Enphase34129
FranklinWH1752
Lunar Energy22
LG1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,005 of 2,233 installs, inverters on 2,233. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Northern Pacific Power Systems, Inc. as developer on 418 battery storage projects and as installer on 349 (349 name it as both), 418 projects in all with 12,276 kWh of storage. 301 have the status Paid, with $6,361,838 in current incentive allocations. Applications were received from Oct 15, 2018 to Feb 24, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3018,558$6,361,838
Reserved594$156,017
Pending Reservation226$57,398
Cancelled1103,597$2,894,093

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency2839,051$8,615,728202$5,883,517
Small Residential Storage941,759$303,95274$233,872
Large-Scale Storage331,331$320,54524$228,744
Residential Solar and Storage Equity - AB 209 Non-POU7121$213,4150$0
Residential Solar and Storage Equity - Ratepayer114$15,7051$15,705

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
939082NORTHERN PACIFIC POWER SYSTEMS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 22, 2009Sep 30, 20282,179

License numbers are the ones the utilities recorded on the interconnection applications (2,181 of 2,233 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 939082. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Northern Pacific Power Systems, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212025Total
unincorporated Marin County9390825121511144

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Sonoma1,763
Marin253
Napa143
Lake26
Mendocino12
Solano11
Alameda6
Fresno6
Santa Clara3
Contra Costa2
San Francisco2
Yolo2
El Dorado1
Kern1
San Luis Obispo1
Santa Cruz1

Top cities

CityInstalls
Santa Rosa867
Petaluma174
Sonoma148
Windsor130
Sebastopol127
Napa90
Novato60
San Rafael60
Cloverdale59
Rohnert Park55
Healdsburg36
Mill Valley35
Glen Ellen33
Saint Helena24
Forestville23

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NORTHERN PACIFIC POWER SYSTEMS INC1,780
Northern Pacific Power Systems, Inc.312
Northern Pacific Power Systems110
Northern Pacific Power Systems Inc24
Northern Pacific Power Systems, Inc4
northern Pacific Power Systems1
Northern pacific Power Systems1
Northern Pacific Power Systems INC1

Common questions

Where does Northern Pacific Power Systems, Inc. install solar?

Its installs are spread across 16 counties. The most are in Sonoma County (1,763 installs), followed by Marin County (253).

How often does Northern Pacific Power Systems, Inc. install batteries with solar?

32.1% of its interconnected solar installs include battery storage across all years, and 90.4% in the last 24 months (480 of 531).

How many Northern Pacific Power Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

541 of its 2,233 interconnected installs (24.2% of the 2,233 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.