CALIFORNIA SOLAR & ELECTRIC INC

How many solar installs has CALIFORNIA SOLAR & ELECTRIC INC done in California, and which license number is on its installs?

CALIFORNIA SOLAR & ELECTRIC INC has 448 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Sep 21, 2021 to Aug 27, 2026), most of them in Los Angeles County (204), Orange County (72) and San Bernardino County (70). CSLB lists license 1073677 (CALIFORNIA SOLAR & ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
448
Last 24 months
235
Total capacity
3,915.2 kW DC
Median system size
8 kW DC
With battery storage
63.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.6% of 448 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
286 installs, latest Aug 27, 2026
Ownership types recorded
PPA 9, lease 1, prepaid lease 6
Median battery size
13.5 kWh (270 installs list a capacity)
First install
Sep 21, 2021
Latest install
Aug 27, 2026
Counties
10
Utilities
SCE 428, SDGE 16, PGE 4
CSLB license
1073677

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202151
2022355
202312221
20247962
2025116105
2026 (through Aug 31, 2026)9179

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

286 of its 448 interconnected installs (63.8% of the 448 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.016236.2%34 (21.9%)
Net Billing Tariff28663.8%239 (86.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 16 of CALIFORNIA SOLAR & ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 9, lease 1, prepaid lease 6, other 0. No residential system in the file lists a third-party owner name that matches CALIFORNIA SOLAR & ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
SolSource DevCo LLC10
Goodleap6

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 235 of CALIFORNIA SOLAR & ELECTRIC INC’s 235 installs name a module maker in the “Generator Manufacturer” fields, and most of those (158, 67.2%) used modules recorded as REC.

In the last 24 months, 235 of CALIFORNIA SOLAR & ELECTRIC INC’s 235 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (144, 61.3%) used inverters recorded as Enphase.

In the last 24 months, 210 of CALIFORNIA SOLAR & ELECTRIC INC’s 235 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (125, 59.5%) used batteries recorded as Tesla.

270 of 273 battery-paired PG&E and SCE installs (98.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC158346
Hyundai4040
Qcells1531
Canadian Solar66
Aptos Solar49
Inverter makerEnphase144275
Tesla8495
SolarEdge756
SMA2not in top list
ABB13
Battery makerTesla125128
Enphase83140
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 446 of 448 installs, inverters on 448. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CALIFORNIA SOLAR & ELECTRIC INC as developer on 61 battery storage projects and as installer on 60 (60 name it as both), 61 projects in all with 903 kWh of storage. 23 have the status Paid, with $223,780 in current incentive allocations. Applications were received from Feb 7, 2024 to Dec 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23355$223,780
Reserved23284$155,492
Pending Reservation575$109,736
Cancelled10188$89,573

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage28351$53,94810$20,831
Equity Resiliency19332$339,84412$199,379
Large-Scale Storage9165$35,8951$3,569
Residential Solar and Storage Equity - AB 209 Non-POU555$148,8930$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1073677CALIFORNIA SOLAR & ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 2, 2021Mar 31, 2027443

License numbers are the ones the utilities recorded on the interconnection applications (448 of 448 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1073677. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CALIFORNIA SOLAR & ELECTRIC INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
unincorporated San Diego County107367711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles204
Orange72
San Bernardino70
Ventura51
Riverside38
San Diego8
San Mateo2
Alameda1
Kern1
Santa Clara1

Top cities

CityInstalls
Santa Clarita13
Camarillo11
Valencia11
Rancho Cucamonga10
Castaic9
Fontana8
Riverside8
South Pasadena8
La Verne7
Lancaster7
Long Beach7
Newbury Park7
Ventura7
Agoura Hills6
Alta Loma6

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA SOLAR & ELECTRIC INC432
California Solar And Electric Inc9
California Solar & Electric7

Common questions

Where does CALIFORNIA SOLAR & ELECTRIC INC install solar?

Its installs are spread across 10 counties. The most are in Los Angeles County (204 installs), followed by Orange County (72).

How often does CALIFORNIA SOLAR & ELECTRIC INC install batteries with solar?

63.2% of its interconnected solar installs include battery storage across all years, and 92.1% in the last 24 months (210 of 228). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many CALIFORNIA SOLAR & ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

286 of its 448 interconnected installs (63.8% of the 448 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.