California Solar Electric
How many solar installs has California Solar Electric done in California, and which license number is on its installs?
California Solar Electric has 2,016 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Aug 13, 2004 to Aug 4, 2026), most of them in Nevada County (1,082), Ventura County (327) and Placer County (221). CSLB lists license 779624 (CALIFORNIA SOLAR ELECTRIC CO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to California Solar Electric here carry more than one CSLB license number: 779624 on 1,176 (CSLB holder CALIFORNIA SOLAR ELECTRIC CO, Grass Valley) and 486924 on 501 (CSLB holder CALIFORNIA SOLAR ELECTRIC SYSTEMS INC, Ventura), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 2,016
- Last 24 months
- 119
- Total capacity
- 13,252.7 kW DC
- Median system size
- 6 kW DC
- With battery storage
- 8.1% all time; 84.9% last 24 months
- Third-party owned
- 0.5% of 1,983 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 133 installs, latest Aug 4, 2026
- Ownership types recorded
- lease 7, other 2
- Median battery size
- 14 kWh (58 installs list a capacity)
- First install
- Aug 13, 2004
- Latest install
- Aug 4, 2026
- Counties
- 28
- Utilities
- PGE 1,522, SCE 494
- CSLB license
- 779624, 486924
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2004 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2004 | 4 | 0 |
| 2005 | 6 | 0 |
| 2006 | 49 | 0 |
| 2007 | 46 | 0 |
| 2008 | 44 | 0 |
| 2009 | 83 | 0 |
| 2010 | 89 | 0 |
| 2011 | 49 | 0 |
| 2012 | 43 | 0 |
| 2013 | 54 | 0 |
| 2014 | 61 | 0 |
| 2015 | 101 | 0 |
| 2016 | 136 | 0 |
| 2017 | 132 | 1 |
| 2018 | 152 | 2 |
| 2019 | 198 | 4 |
| 2020 | 81 | 5 |
| 2021 | 108 | 2 |
| 2022 | 170 | 8 |
| 2023 | 239 | 14 |
| 2024 | 70 | 42 |
| 2025 | 59 | 50 |
| 2026 (through Aug 31, 2026) | 42 | 36 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
133 of its 2,016 interconnected installs (6.6% of the 2,016 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 4, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 819 | 40.6% | not counted |
| NEM 2.0 | 1,064 | 52.8% | 41 (3.9%) |
| Net Billing Tariff | 133 | 6.6% | 115 (86.5%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 9 of California Solar Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 7, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches California Solar Electric exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower Capital LLC | 4 |
| SunPower | 2 |
| Roger House | 1 |
| SunRun | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 105 of California Solar Electric’s 119 installs name a module maker in the “Generator Manufacturer” fields, and most of those (61, 58.1%) used modules recorded as REC.
In the last 24 months, 119 of California Solar Electric’s 119 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (55, 46.2%) used inverters recorded as Tesla.
In the last 24 months, 88 of California Solar Electric’s 119 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (43, 48.9%) used batteries recorded as Tesla.
136 of 164 battery-paired PG&E and SCE installs (82.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 61 | 378 |
| JA Solar | 19 | not in top list | |
| SunPower | 18 | 917 | |
| Silfab | 5 | not in top list | |
| Evergreen Solar | 2 | 111 | |
| Inverter maker | Tesla | 55 | 86 |
| Enphase | 51 | 516 | |
| FranklinWH | 20 | not in top list | |
| PointGuard Energy Inc. | 11 | not in top list | |
| SMA | 8 | 289 | |
| Battery maker | Tesla | 43 | 54 |
| FranklinWH | 19 | 45 | |
| Enphase | 11 | 16 | |
| PointGuard Energy Inc. | 11 | 11 | |
| Sigenergy | 4 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,737 of 2,016 installs, inverters on 2,016. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names California Solar Electric as developer on 122 battery storage projects and as installer on 436 (116 name it as both), 442 projects in all with 10,498 kWh of storage. 346 have the status Paid, with $6,728,450 in current incentive allocations. Applications were received from Feb 16, 2015 to Dec 29, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 346 | 8,269 | $6,728,450 |
| Reserved | 8 | 134 | $197,350 |
| Cancelled | 88 | 2,095 | $1,557,778 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Equity Resiliency | 311 | 7,848 | $7,745,936 | 252 | $6,276,180 |
| Small Residential Storage | 110 | 2,273 | $384,010 | 86 | $304,308 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 10 | 149 | $272,101 | 4 | $107,901 |
| Large-Scale Storage | 7 | 181 | $40,341 | 1 | $10,092 |
| Residential Solar and Storage Equity - Ratepayer | 2 | 28 | $25,779 | 2 | $25,779 |
| Non-Residential Storage Equity | 1 | 13 | $11,220 | 0 | $0 |
| Not stated | 1 | 5 | $4,190 | 1 | $4,190 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 779624 | CALIFORNIA SOLAR ELECTRIC CO (Corporation) | CLEAR | C-10 Electrical Contractor | May 30, 2000 | Jul 31, 2028 | 1,176 |
| 486924 | CALIFORNIA SOLAR ELECTRIC SYSTEMS INC (Corporation) | CLEAR | C-10 Electrical Contractor | Feb 11, 1986 | Dec 31, 2026 | 501 |
License numbers are the ones the utilities recorded on the interconnection applications (1,682 of 2,016 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 779624, 486924. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- CALIFORNIA SOLAR ELECTRIC SYSTEMS INC: 513 installs, license 486924
Counties
| County | Installs |
|---|---|
| Nevada | 1,082 |
| Ventura | 327 |
| Placer | 221 |
| Santa Barbara | 171 |
| Yuba | 75 |
| Butte | 31 |
| El Dorado | 31 |
| Sutter | 25 |
| Los Angeles | 16 |
| Colusa | 4 |
| Yolo | 4 |
| Kern | 3 |
| San Mateo | 3 |
| Shasta | 3 |
| Sonoma | 3 |
| Alameda | 2 |
| Glenn | 2 |
| Marin | 2 |
| Sierra | 2 |
| Amador | 1 |
| Contra Costa | 1 |
| Plumas | 1 |
| San Bernardino | 1 |
| San Joaquin | 1 |
| San Luis Obispo | 1 |
| Stanislaus | 1 |
| Tulare | 1 |
| Tuolumne | 1 |
Top cities
| City | Installs |
|---|---|
| Grass Valley | 510 |
| Nevada City | 332 |
| Ojai | 179 |
| Penn Valley | 164 |
| Auburn | 114 |
| Santa Barbara | 114 |
| Ventura | 64 |
| Rough And Ready | 34 |
| Oak View | 23 |
| Browns Valley | 22 |
| Rocklin | 20 |
| Goleta | 19 |
| Lincoln | 19 |
| Colfax | 18 |
| Smartsville | 18 |
Names as recorded by the utilities
The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| CALIFORNIA SOLAR ELECTRIC CO | 707 |
| California Solar Electric | 551 |
| California Solar Electric Company | 533 |
| CALIFORNIA SOLAR ELECTRIC COMPANY | 80 |
| California Solar Electric Co | 70 |
| CALIFORNIA SOLAR ELECTRIC | 47 |
| California Solar ELectric Co | 12 |
| California Solar Electric Co. | 11 |
| California Solar Electric CO | 2 |
| California Solar electric Company | 2 |
| california Solar Electric Co | 1 |
Common questions
Where does California Solar Electric install solar?
Its installs are spread across 28 counties. The most are in Nevada County (1,082 installs), followed by Ventura County (327).
How often does California Solar Electric install batteries with solar?
8.1% of its interconnected solar installs include battery storage across all years, and 84.9% in the last 24 months (101 of 119).
How many California Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?
133 of its 2,016 interconnected installs (6.6% of the 2,016 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.