R C ELECTRIC has 100 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Apr 26, 2018 to Jul 30, 2026), most of them in Ventura County (53), Los Angeles County (26) and Kern County (7). CSLB lists license 615393 (REC ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to R C ELECTRIC here carry more than one CSLB license number: 615393 on 67 (CSLB holder REC ELECTRIC INC, Ventura) and 1108086 on 33 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
100
Last 24 months
62
Total capacity
661.6 kW DC
Median system size
5.7 kW DC
With battery storage
66.0% all time; 72.6% last 24 months
Third-party owned
28.0% of 100 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
42 installs, latest Jul 30, 2026
Ownership types recorded
PPA 28
Median battery size
10 kWh (57 installs list a capacity)
First install
Apr 26, 2018
Latest install
Jul 30, 2026
Counties
11
Utilities
SCE 85, PGE 15
CSLB license
615393, 1108086

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
201920
202042
202175
202286
202385
2024133
20254637
2026 (through Aug 31, 2026)98

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

42 of its 100 interconnected installs (42.0% of the 100 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.2% of those include battery storage. The latest Net Billing Tariff install was approved Jul 30, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.0%not counted
NEM 2.05757.0%25 (43.9%)
Net Billing Tariff4242.0%40 (95.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 28 of R C ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 28, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches R C ELECTRIC exactly.

Third-party owner named on its installsInstalls
LightReach9
LightReach Finance5
Palmetto3
Enfin2
Lightreach Financing2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 62 of R C ELECTRIC’s 62 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (31, 50.0%) used modules recorded as Qcells.

In the last 24 months, 62 of R C ELECTRIC’s 62 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (30, 48.4%) used inverters recorded as Enphase.

In the last 24 months, 44 of R C ELECTRIC’s 62 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (20, 45.5%) used batteries recorded as Enphase.

63 of 66 battery-paired PG&E and SCE installs (95.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3150
JA Solar2021
LONGi55
JinkoSolar23
Aptos Solar1not in top list
Inverter makerEnphase3043
SolarEdge2645
Tesla55
Growatt12
Power-One1not in top list
Battery makerEnphase2020
FranklinWH1111
SolarEdge88
Tesla55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 99 of 100 installs, inverters on 100. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
615393REC ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 16, 1991Aug 31, 202867
1108086Sole owner license (name not shown)CLEARC-10 Electrical ContractorAug 2, 2023Feb 28, 202733

License numbers are the ones the utilities recorded on the interconnection applications (100 of 100 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 615393, 1108086. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura53
Los Angeles26
Kern7
Santa Clara6
Orange2
Contra Costa1
Kings1
San Joaquin1
San Luis Obispo1
Santa Barbara1
Tulare1

Top cities

CityInstalls
Ventura39
Malibu11
Ojai6
Arcadia4
Bakersfield4
San Jose4
La Canada3
San Gabriel3
Delano2
Santa Paula2
Sunnyvale2
Arroyo Grande1
Brentwood1
Camarillo1
Covina1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
R C ELECTRIC64
R - C ELECTRIC33
R-C-ELECTRIC3

Common questions

Where does R C ELECTRIC install solar?

Its installs are spread across 11 counties. The most are in Ventura County (53 installs), followed by Los Angeles County (26).

How often does R C ELECTRIC install batteries with solar?

66.0% of its interconnected solar installs include battery storage across all years, and 72.6% in the last 24 months (45 of 62).

How many R C ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

42 of its 100 interconnected installs (42.0% of the 100 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.