Bitterend Ventures Inc DBA BVI SOLAR has 705 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 28, 2018 to Aug 13, 2026), most of them in San Diego County (515), Orange County (87) and Los Angeles County (48). CSLB lists license 1033754 (B V I SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 705
- Last 24 months
- 119
- Total capacity
- 4,836.8 kW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 10.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 2.9% of 700 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 101 installs, latest Aug 13, 2026
- Ownership types recorded
- PPA 11, lease 9
- Median battery size
- 13.5 kWh (19 installs list a capacity)
- First install
- Feb 28, 2018
- Latest install
- Aug 13, 2026
- Counties
- 7
- Utilities
- SDGE 527, SCE 178
- CSLB license
- 1033754
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 94 | 0 |
| 2019 | 88 | 0 |
| 2020 | 66 | 2 |
| 2021 | 75 | 0 |
| 2022 | 82 | 0 |
| 2023 | 119 | 3 |
| 2024 | 82 | 3 |
| 2025 | 71 | 5 |
| 2026 (through Aug 31, 2026) | 28 | 6 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
101 of its 705 interconnected installs (14.4% of the 700 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 13, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 599 | 85.6% | 7 (4.2%) |
| Net Billing Tariff | 101 | 14.4% | 12 (92.3%) |
| Not recorded | 5 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 20 of Bitterend Ventures Inc DBA BVI SOLAR’s installs the utility recorded a third-party ownership type: PPA 11, lease 9, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Bitterend Ventures Inc DBA BVI SOLAR exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Lifestyle Energy | 7 |
| BVI Solar | 4 |
| Lifestyle | 2 |
| Spruce | 2 |
| Spruce Finance | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 109 of Bitterend Ventures Inc DBA BVI SOLAR’s 119 installs name a module maker in the “Generator Manufacturer” fields, and most of those (64, 58.7%) used modules recorded as CertainTeed.
In the last 24 months, 114 of Bitterend Ventures Inc DBA BVI SOLAR’s 119 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (59, 51.8%) used inverters recorded as Enphase.
In the last 24 months, 11 of Bitterend Ventures Inc DBA BVI SOLAR’s 119 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 100.0%) used batteries recorded as Tesla.
19 of 19 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | CertainTeed | 64 | 433 |
| Mission Solar | 29 | 33 | |
| SEGSolarInc. | 5 | not in top list | |
| Canadian Solar | 4 | 26 | |
| Qcells | 2 | 26 | |
| Inverter maker | Enphase | 59 | 424 |
| Tesla | 52 | 60 | |
| SolarEdge | 2 | 203 | |
| APsystems (Altenergy Power System) | 1 | not in top list | |
| SMA | 1 | 5 | |
| Battery maker | Tesla | 11 | 12 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 684 of 705 installs, inverters on 700. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Bitterend Ventures Inc DBA BVI SOLAR as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 29 kWh of storage. 1 have the status Paid, with $1,303 in current incentive allocations. Applications were received from Jan 28, 2022 to Nov 15, 2022.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 10 | $1,303 |
| RRF Rejected | 1 | 19 | $2,607 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 1 | 10 | $1,303 | 1 | $1,303 |
| Not stated | 1 | 19 | $2,607 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1033754 | B V I SOLAR (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | Dec 7, 2017 | Dec 31, 2027 | 693 |
License numbers are the ones the utilities recorded on the interconnection applications (700 of 705 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1033754. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Bitterend Ventures Inc DBA BVI SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 1033754 | 2 | 16 | 16 | 14 | 20 | 16 | 8 | 5 | 11 | 108 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| San Diego | 515 |
| Orange | 87 |
| Los Angeles | 48 |
| Riverside | 46 |
| San Bernardino | 6 |
| Tulare | 2 |
| Kern | 1 |
Top cities
| City | Installs |
|---|---|
| San Diego | 237 |
| La Jolla | 44 |
| Oceanside | 34 |
| Yorba Linda | 27 |
| Chula Vista | 16 |
| Escondido | 15 |
| Carlsbad | 13 |
| Spring Valley | 13 |
| El Cajon | 12 |
| Encinitas | 11 |
| Corona | 10 |
| Del Mar | 9 |
| Fullerton | 9 |
| La Mesa | 9 |
| Rancho Santa Margarita | 9 |
Names as recorded by the utilities
The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Bitterend Ventures Inc DBA BVI SOLAR | 527 |
| BITTEREND VENTURES INC | 140 |
| BITTEREND VENTURES INC DBA B V I SOLAR | 34 |
| Bitterend Ventures Inc | 1 |
| Bitterend Ventures, Inc | 1 |
| Bitterend Ventures, INC | 1 |
| Bitterend Ventures, Inc. | 1 |
Common questions
Where does Bitterend Ventures Inc DBA BVI SOLAR install solar?
Its installs are spread across 7 counties. The most are in San Diego County (515 installs), followed by Orange County (87).
How often does Bitterend Ventures Inc DBA BVI SOLAR install batteries with solar?
10.7% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (11 of 11). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Bitterend Ventures Inc DBA BVI SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?
101 of its 705 interconnected installs (14.4% of the 700 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.