Asgard Electric

How many solar installs has Asgard Electric done in California, and which license number is on its installs?

Asgard Electric has 258 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jan 6, 2012 to Aug 12, 2026), most of them in San Diego County (251), Orange County (4) and Riverside County (3). CSLB lists license 912557 (ASGARD ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
258
Last 24 months
135
Total capacity
1,219.2 kW DC
Median system size
3.1 kW DC
With battery storage
16.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.4% of 255 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
138 installs, latest Aug 12, 2026
Ownership types recorded
lease 1
Median battery size
27 kWh (1 installs list a capacity)
First install
Jan 6, 2012
Latest install
Aug 12, 2026
Counties
3
Utilities
SDGE 252, SCE 6
CSLB license
912557

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
201300
201400
2015140
2016380
2017120
2018131
201990
202070
202160
202250
2023140
202470
2025930
2026 (through Aug 31, 2026)380

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

138 of its 258 interconnected installs (53.5% of the 258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03513.6%not counted
NEM 2.08532.9%1 (100.0%)
Net Billing Tariff13853.5%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Asgard Electric’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Asgard Electric exactly.

Third-party owner named on its installsInstalls
Clean Power Finance1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 133 of Asgard Electric’s 135 installs name a module maker in the “Generator Manufacturer” fields, and most of those (101, 75.9%) used modules recorded as Qcells.

In the last 24 months, 135 of Asgard Electric’s 135 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (132, 97.8%) used inverters recorded as Enphase.

In the last 24 months, none of Asgard Electric’s 135 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells101127
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.2424
SEGSolarInc.8not in top list
Inverter makerEnphase132209
Tesla33
SMA229
Battery makerTesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 248 of 258 installs, inverters on 256. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Asgard Electric as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 53 kWh of storage. 3 have the status Paid, with $10,440 in current incentive allocations. Applications were received from Mar 5, 2020 to Dec 22, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid353$10,440

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage353$10,4403$10,440

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
912557ASGARD ENERGY (Corporation)CLEARC-10 Electrical ContractorMar 18, 2008Sep 30, 2027237

License numbers are the ones the utilities recorded on the interconnection applications (237 of 258 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 912557. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Asgard Electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County9125574221413

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego251
Orange4
Riverside3

Top cities

CityInstalls
Carlsbad124
San Diego30
Santee18
Oceanside13
Vista13
Chula Vista7
El Cajon7
Escondido6
San Marcos6
Poway5
Bonita4
Cardiff3
Del Mar2
Murrieta2
Rancho Santa Fe2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Asgard Electric256
ASGARD ELECTRIC2

Common questions

Where does Asgard Electric install solar?

Its installs are spread across 3 counties. The most are in San Diego County (251 installs), followed by Orange County (4).

How often does Asgard Electric install batteries with solar?

16.7% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Asgard Electric installs are under NEM 3.0 (the Net Billing Tariff)?

138 of its 258 interconnected installs (53.5% of the 258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.