BURGESONS HEATING AND AIR CONDITIONING INC

How many solar installs has BURGESONS HEATING AND AIR CONDITIONING INC done in California, and which license number is on its installs?

BURGESONS HEATING AND AIR CONDITIONING INC has 262 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 15, 2020 to Jul 28, 2026), most of them in San Bernardino County (214), Riverside County (45) and Orange County (2). CSLB lists license 263871 (BURGESONS HEATING AND AIR CONDITIONING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-43, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
262
Last 24 months
49
Total capacity
2,245 kW DC
Median system size
8 kW DC
With battery storage
30.9% all time; 91.8% last 24 months
Third-party owned
0.0% of 262 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
73 installs, latest Jul 28, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (81 installs list a capacity)
First install
Jan 15, 2020
Latest install
Jul 28, 2026
Counties
4
Utilities
SCE 262
CSLB license
263871

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020140
202190
2022666
202310316
20243427
20252017
2026 (through Aug 31, 2026)1615

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

73 of its 262 interconnected installs (27.9% of the 262 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.018972.1%16 (8.5%)
Net Billing Tariff7327.9%65 (89.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BURGESONS HEATING AND AIR CONDITIONING INC’s installs. No residential system in the file lists a third-party owner name that matches BURGESONS HEATING AND AIR CONDITIONING INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of BURGESONS HEATING AND AIR CONDITIONING INC’s 49 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 67.3%) used modules recorded as Qcells.

In the last 24 months, 49 of BURGESONS HEATING AND AIR CONDITIONING INC’s 49 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (49, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 45 of BURGESONS HEATING AND AIR CONDITIONING INC’s 49 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (44, 97.8%) used batteries recorded as Enphase.

81 of 81 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells33189
JA Solar88
Axitec33
Hyundai2not in top list
Canadian Solar1not in top list
Inverter makerEnphase49140
Battery makerEnphase4480
IQBATTERY-5P-1P-NA11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 251 of 262 installs, inverters on 262. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
263871BURGESONS HEATING AND AIR CONDITIONING INC (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-43Jun 29, 1970Mar 31, 2027262

License numbers are the ones the utilities recorded on the interconnection applications (262 of 262 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 263871. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino214
Riverside45
Orange2
Los Angeles1

Top cities

CityInstalls
Redlands90
Yucaipa52
Beaumont17
Highland16
Calimesa9
Loma Linda8
Cherry Valley7
Bloomington6
Rancho Cucamonga6
Mentone5
San Bernardino5
Apple Valley4
Riverside4
Fontana3
Lake Arrowhead3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BURGESONS HEATING AND AIR CONDITIONING INC262

Common questions

Where does BURGESONS HEATING AND AIR CONDITIONING INC install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (214 installs), followed by Riverside County (45).

How often does BURGESONS HEATING AND AIR CONDITIONING INC install batteries with solar?

30.9% of its interconnected solar installs include battery storage across all years, and 91.8% in the last 24 months (45 of 49).

How many BURGESONS HEATING AND AIR CONDITIONING INC installs are under NEM 3.0 (the Net Billing Tariff)?

73 of its 262 interconnected installs (27.9% of the 262 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.