Option One Solar

How many solar installs has Option One Solar done in California, and which license number is on its installs?

Option One Solar has 1,519 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 15, 2018 to Aug 31, 2026), most of them in San Bernardino County (1,221), Riverside County (137) and Los Angeles County (102). CSLB lists license 985340 (OPTION ONE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,519
Last 24 months
371
Total capacity
14,509.5 kW DC
Median system size
8.9 kW DC
With battery storage
32.1% all time; 86.5% last 24 months
Third-party owned
0.3% of 1,519 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
450 installs, latest Aug 31, 2026
Ownership types recorded
PPA 4
Median battery size
13.5 kWh (486 installs list a capacity)
First install
Feb 15, 2018
Latest install
Aug 31, 2026
Counties
7
Utilities
SCE 1,517, PGE 2
CSLB license
985340

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201840
201920
202010
202116310
202240618
202347655
2024163140
2025198173
2026 (through Aug 31, 2026)10691

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

450 of its 1,519 interconnected installs (29.6% of the 1,519 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01,06970.4%99 (9.3%)
Net Billing Tariff45029.6%388 (86.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of Option One Solar’s installs the utility recorded a third-party ownership type: PPA 4, lease 0, prepaid lease 0, other 0. Across all installers, 4 residential systems list a third-party owner name that matches Option One Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Participate Energy LLC3
Participate1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 371 of Option One Solar’s 371 installs name a module maker in the “Generator Manufacturer” fields, and most of those (321, 86.5%) used modules recorded as Hyundai.

In the last 24 months, 371 of Option One Solar’s 371 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (294, 79.2%) used inverters recorded as Tesla.

In the last 24 months, 304 of Option One Solar’s 371 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (286, 94.1%) used batteries recorded as Tesla.

458 of 487 battery-paired PG&E and SCE installs (94.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai321884
Suzhou Talesun Solar Technologies1942
Growatt8not in top list
REC8400
CertainTeed6not in top list
Inverter makerTesla294395
Enphase57520
Growatt8not in top list
SolarEdge8420
SunPower4118
Battery makerTesla286411
Enphase1745
Battery11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,460 of 1,519 installs, inverters on 1,519. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Option One Solar as developer on 0 battery storage projects and as installer on 101 (0 name it as both), 101 projects in all with 2,154 kWh of storage. 38 have the status Paid, with $925,320 in current incentive allocations. Applications were received from May 1, 2017 to Jul 22, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid38888$925,320
Reserved21317$540,515
Pending Reservation579$159,070
Cancelled35833$849,653
RRF Rejected237$6,631

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency491,388$1,399,98127$738,230
Residential Solar and Storage Equity - AB 209 Non-POU34462$898,8715$132,188
Small Residential Storage9141$33,8794$16,359
Residential Storage Equity486$65,6361$9,860
Residential Solar and Storage Equity - AB 209340$76,1911$28,682
Not stated237$6,6310$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985340OPTION ONE SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJul 22, 2013Jul 31, 20271,518

License numbers are the ones the utilities recorded on the interconnection applications (1,519 of 1,519 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985340. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Option One Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202320242025Total
unincorporated San Diego County985340131131212

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino1,221
Riverside137
Los Angeles102
Orange43
Ventura9
Kern6
Contra Costa1

Top cities

CityInstalls
Apple Valley458
Victorville173
Hesperia142
Barstow53
Phelan46
Helendale44
Palm Springs30
Oak Hills27
Yucca Valley25
Fontana23
Lucerne Valley20
Alta Loma17
Redlands17
Adelanto16
San Bernardino16

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OPTION ONE SOLAR1,081
Option One Solar431
OPTION-ONE-SOLAR4
OPTION ONE SOLAR CORPORATION3

Common questions

Where does Option One Solar install solar?

Its installs are spread across 7 counties. The most are in San Bernardino County (1,221 installs), followed by Riverside County (137).

How often does Option One Solar install batteries with solar?

32.1% of its interconnected solar installs include battery storage across all years, and 86.5% in the last 24 months (321 of 371).

How many Option One Solar installs are under NEM 3.0 (the Net Billing Tariff)?

450 of its 1,519 interconnected installs (29.6% of the 1,519 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.