GAMBERO ELECTRICAL

How many solar installs has GAMBERO ELECTRICAL done in California, and which license number is on its installs?

GAMBERO ELECTRICAL has 44 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Dec 21, 2020 to Apr 8, 2026), most of them in Madera County (18), Fresno County (12) and Los Angeles County (8). CSLB lists license 1061878 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
6
Total capacity
257.7 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 44 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest May 1, 2025
Ownership types recorded
none recorded
First install
Dec 21, 2020
Latest install
Apr 8, 2026
Counties
5
Utilities
PGE 30, SCE 14
CSLB license
1061878

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202170
2022100
2023160
202460
202530
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 44 interconnected installs (13.6% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved May 1, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03886.4%0 (0.0%)
Net Billing Tariff613.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GAMBERO ELECTRICAL’s installs. No residential system in the file lists a third-party owner name that matches GAMBERO ELECTRICAL exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of GAMBERO ELECTRICAL’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.

In the last 24 months, 6 of GAMBERO ELECTRICAL’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 83.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells432
ET SOLAR POWER HONGKONG LIMITED11
Inverter makerEnphase532
APsystems (Altenergy Power System)11
Fronius11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 44 installs, inverters on 44. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GAMBERO ELECTRICAL as developer on 0 battery storage projects and as installer on 11 (0 name it as both), 11 projects in all with 255 kWh of storage. 11 have the status Paid, with $226,270 in current incentive allocations. Applications were received from Mar 17, 2021 to Jun 25, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11255$226,270

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency10232$222,41810$222,418
Small Residential Storage123$3,8521$3,852

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1061878Sole owner license (name not shown)CLEARC-10 Electrical ContractorJan 2, 2020Jan 31, 202844

License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1061878. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GAMBERO ELECTRICAL’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County106187811

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Madera18
Fresno12
Los Angeles8
Orange3
Riverside3

Top cities

CityInstalls
Madera18
Fresno8
Clovis4
Long Beach3
Corona2
Manhattan Beach2
Buena Park1
Costa Mesa1
Fontana1
Fountain Valley1
Hawthorne1
Rancho Palos Verdes1
Santa Monica1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GAMBERO ELECTRICAL38
Gambero Electrical3
Gambero electrical LLC3

Common questions

Where does GAMBERO ELECTRICAL install solar?

Its installs are spread across 5 counties. The most are in Madera County (18 installs), followed by Fresno County (12).

How often does GAMBERO ELECTRICAL install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 6).

How many GAMBERO ELECTRICAL installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 44 interconnected installs (13.6% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.