How many solar installs has OFF GRID ENERGY SOLUTIONS LLC done in California, and which license number is on its installs?

OFF GRID ENERGY SOLUTIONS LLC has 184 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Sep 19, 2024 to Aug 26, 2026), most of them in Riverside County (69), Orange County (29) and San Bernardino County (25). CSLB lists license 1110238 (AVEYO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
184
Last 24 months
184
Total capacity
1,716.9 kW DC
Median system size
8.6 kW DC
With battery storage
92.9% all time; 92.9% last 24 months
Third-party owned
87.0% of 184 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
184 installs, latest Aug 26, 2026
Ownership types recorded
PPA 137, lease 22, other 1
Median battery size
13.5 kWh (152 installs list a capacity)
First install
Sep 19, 2024
Latest install
Aug 26, 2026
Counties
21
Utilities
SCE 148, PGE 36
CSLB license
1110238

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241610
2025157151
2026 (through Aug 31, 2026)1110

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

184 of its 184 interconnected installs (100.0% of the 184 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff184100.0%171 (92.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 160 of OFF GRID ENERGY SOLUTIONS LLC’s installs the utility recorded a third-party ownership type: PPA 137, lease 22, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches OFF GRID ENERGY SOLUTIONS LLC exactly.

Third-party owner named on its installsInstalls
EnFin85
Sunnova29
Goodleap20
LightReach16
Light Reach7

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 179 of OFF GRID ENERGY SOLUTIONS LLC’s 184 installs name a module maker in the “Generator Manufacturer” fields, and most of those (178, 99.4%) used modules recorded as Qcells.

In the last 24 months, 184 of OFF GRID ENERGY SOLUTIONS LLC’s 184 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (111, 60.3%) used inverters recorded as Enphase.

In the last 24 months, 165 of OFF GRID ENERGY SOLUTIONS LLC’s 184 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (64, 38.8%) used batteries recorded as Tesla.

165 of 171 battery-paired PG&E and SCE installs (96.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells178178
SunPower77
Canadian Solar33
GENERIC PV MODULES33
JA Solar33
Inverter makerEnphase111111
SolarEdge6666
Tesla5454
SunPower1010
FranklinWH44
Battery makerTesla6464
SolarEdge4848
Enphase4444
FranklinWH99
Lithion Battery Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 179 of 184 installs, inverters on 184. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names OFF GRID ENERGY SOLUTIONS LLC as developer on 29 battery storage projects and as installer on 28 (28 name it as both), 29 projects in all with 438 kWh of storage. 2 have the status Paid, with $27,954 in current incentive allocations. Applications were received from Apr 15, 2024 to Jan 5, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid232$27,954
Reserved8125$34,471
Pending Reservation126$3,702
Waitlist110$18,588
Cancelled16235$59,123
RRF Rejected110$1,290

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage23329$43,0101$714
Equity Resiliency380$75,2411$27,241
Residential Solar and Storage Equity - AB 209 Non-POU219$25,5880$0
Not stated110$1,2900$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1110238AVEYO (Limited Liability)CLEARC-10 Electrical ContractorSep 19, 2023Sep 30, 2027183

License numbers are the ones the utilities recorded on the interconnection applications (184 of 184 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1110238. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list OFF GRID ENERGY SOLUTIONS LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
unincorporated San Diego County1110238235

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside69
Orange29
San Bernardino25
Los Angeles19
Amador6
Kern6
Solano5
Contra Costa4
San Joaquin4
Shasta3
Fresno2
Napa2
Placer2
Alameda1
El Dorado1
Lake1
Marin1
Plumas1
Sonoma1
Tulare1
Yuba1

Top cities

CityInstalls
Jurupa Valley32
Lancaster9
Fullerton8
Riverside8
Fontana7
Winchester6
Ione5
Rancho Cucamonga5
Rosamond5
La Habra4
Yorba Linda4
Antioch3
Hemet3
Homeland3
Lake Forest3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OFF GRID ENERGY SOLUTIONS LLC183
OFF GRID ENERGY SOLUTIONS LLC DBA Aveyo1

Common questions

Where does OFF GRID ENERGY SOLUTIONS LLC install solar?

Its installs are spread across 21 counties. The most are in Riverside County (69 installs), followed by Orange County (29).

How often does OFF GRID ENERGY SOLUTIONS LLC install batteries with solar?

92.9% of its interconnected solar installs include battery storage across all years, and 92.9% in the last 24 months (171 of 184).

How many OFF GRID ENERGY SOLUTIONS LLC installs are under NEM 3.0 (the Net Billing Tariff)?

184 of its 184 interconnected installs (100.0% of the 184 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.