KBC ENERGY GROUP INC

How many solar installs has KBC ENERGY GROUP INC done in California, and which license number is on its installs?

KBC ENERGY GROUP INC has 297 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jun 1, 2022 to Jun 11, 2026), most of them in Orange County (137), Los Angeles County (68) and Kern County (33). CSLB lists license 1088622 (KBC ENERGY GROUP INC) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
297
Last 24 months
74
Total capacity
2,928.3 kW DC
Median system size
9.6 kW DC
With battery storage
28.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 74.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
30.3% of 297 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
103 installs, latest Jun 11, 2026
Ownership types recorded
PPA 11, lease 1, other 78
Median battery size
19.1 kWh (78 installs list a capacity)
First install
Jun 1, 2022
Latest install
Jun 11, 2026
Counties
10
Utilities
SCE 254, PGE 35, SDGE 8
CSLB license
1088622

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022481
20231443
20244436
20254830
2026 (through Aug 31, 2026)1313

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

103 of its 297 interconnected installs (34.7% of the 297 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.4% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.019465.3%2 (1.1%)
Net Billing Tariff10334.7%81 (79.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 90 of KBC ENERGY GROUP INC’s installs the utility recorded a third-party ownership type: PPA 11, lease 1, prepaid lease 0, other 78. Across all installers, 25 residential systems list a third-party owner name that matches KBC ENERGY GROUP INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
hdm capital llc35
KBC ENERGY GROUP INC25
HDM LLC20
HDM Renewable Finance7
HDM CAPITAL LIC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 74 of KBC ENERGY GROUP INC’s 74 installs name a module maker in the “Generator Manufacturer” fields, and most of those (43, 58.1%) used modules recorded as Qcells.

In the last 24 months, 74 of KBC ENERGY GROUP INC’s 74 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (68, 91.9%) used inverters recorded as Enphase.

In the last 24 months, 39 of KBC ENERGY GROUP INC’s 74 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 56.4%) used batteries recorded as LG.

65 of 83 battery-paired PG&E and SCE installs (78.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells43255
VSUN (Vietnam Sunergy)1515
LG1212
Silfab1116
Hyundai66
Inverter makerEnphase68201
LG3not in top list
Qcells3not in top list
SolarEdge265
Tesla26
Battery makerLG2222
Tesla1010
Enphase632
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 291 of 297 installs, inverters on 297. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1088622KBC ENERGY GROUP INC (Corporation)Contr Bond SuspC-10 Electrical ContractorMar 15, 2022Mar 31, 2028297

License numbers are the ones the utilities recorded on the interconnection applications (297 of 297 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1088622. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list KBC ENERGY GROUP INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated San Diego County108862211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange137
Los Angeles68
Kern33
San Bernardino29
Riverside15
San Diego8
Ventura3
Tulare2
Alameda1
Fresno1

Top cities

CityInstalls
Fullerton38
Bakersfield33
Buena Park23
La Mirada14
Brea12
La Habra12
Irvine9
Yorba Linda9
Aliso Viejo6
Cypress6
San Bernardino6
Torrance6
Chino Hills4
Corona4
Diamond Bar4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KBC ENERGY GROUP INC296
KBC Energy Group Inc1

Common questions

Where does KBC ENERGY GROUP INC install solar?

Its installs are spread across 10 counties. The most are in Orange County (137 installs), followed by Los Angeles County (68).

How often does KBC ENERGY GROUP INC install batteries with solar?

28.7% of its interconnected solar installs include battery storage across all years, and 74.3% in the last 24 months (55 of 74). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many KBC ENERGY GROUP INC installs are under NEM 3.0 (the Net Billing Tariff)?

103 of its 297 interconnected installs (34.7% of the 297 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.4% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.