United Sun Energy

How many solar installs has United Sun Energy done in California, and which license number is on its installs?

United Sun Energy has 663 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Jan 16, 2013 to Jun 22, 2026), most of them in Butte County (517), Glenn County (58) and Tehama County (28). CSLB lists license 977269 (UNITED SUN ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
663
Last 24 months
51
Total capacity
7,062.2 kW DC
Median system size
8.7 kW DC
With battery storage
5.6% all time; 52.9% last 24 months
Third-party owned
0.3% of 663 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest Jun 22, 2026
Ownership types recorded
PPA 2
First install
Jan 16, 2013
Latest install
Jun 22, 2026
Counties
15
Utilities
PGE 663
CSLB license
977269

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013160
2014260
2015470
2016450
2017370
2018470
2019790
2020670
2021600
2022830
2023861
20242412
20253818
2026 (through Aug 31, 2026)86

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 663 interconnected installs (5.7% of the 663 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.4% of those include battery storage. The latest Net Billing Tariff install was approved Jun 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014121.3%not counted
NEM 2.048473.0%0 (0.0%)
Net Billing Tariff385.7%37 (97.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of United Sun Energy’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches United Sun Energy exactly.

Third-party owner named on its installsInstalls
KP Energy Partners LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 45 of United Sun Energy’s 51 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 75.6%) used modules recorded as Trina Solar.

In the last 24 months, 51 of United Sun Energy’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (51, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 27 of United Sun Energy’s 51 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 100.0%) used batteries recorded as Enphase.

37 of 37 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar3466
Qcells11320
Canadian Solar3166
SolarWorld2not in top list
LG126
Inverter makerEnphase51419
SolarEdge3132
SMA2121
Fronius13
SunPower13
Battery makerEnphase2737

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 633 of 663 installs, inverters on 663. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names United Sun Energy as developer on 1 battery storage project and as installer on 2 (1 name it as both), 2 projects in all with 71 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 23, 2016 to Oct 15, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled271$33,540

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency129$27,9230$0
Not stated142$5,6170$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
977269UNITED SUN ENERGY INC (Corporation)CLEARC-10 Electrical ContractorSep 28, 2012Sep 30, 2028632

License numbers are the ones the utilities recorded on the interconnection applications (632 of 663 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 977269. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Butte517
Glenn58
Tehama28
Yuba14
Shasta10
Colusa8
Plumas8
Sutter8
Mendocino2
Merced2
Placer2
Sonoma2
Yolo2
Calaveras1
El Dorado1

Top cities

CityInstalls
Chico394
Oroville50
Orland45
Paradise35
Durham27
Red Bluff14
Plumas Lake10
Willows7
Yuba City7
Los Molinos6
Colusa5
Gridley5
Anderson4
Corning4
Glenn4

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNITED SUN ENERGY INC384
United Sun Energy234
UNITED SUN ENERGY36
United Sun Energy, Inc.4
UNITED SUN ENERGY, INC.3
United Sun Energy Inc1
UNITED SUN ENERGY, INC1

Common questions

Where does United Sun Energy install solar?

Its installs are spread across 15 counties. The most are in Butte County (517 installs), followed by Glenn County (58).

How often does United Sun Energy install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years, and 52.9% in the last 24 months (27 of 51).

How many United Sun Energy installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 663 interconnected installs (5.7% of the 663 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.