Wing Solar & Wood Energy, Inc.

How many solar installs has Wing Solar & Wood Energy, Inc. done in California, and which license number is on its installs?

Wing Solar & Wood Energy, Inc. has 304 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Aug 25, 2003 to Jul 15, 2026), most of them in Tehama County (203), Shasta County (40) and Butte County (28). CSLB lists license 292491 (WING SOLAR & WOOD ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-46, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
304
Last 24 months
16
Total capacity
2,439.2 kW DC
Median system size
7.4 kW DC
With battery storage
3.3% all time; 56.3% last 24 months
Third-party owned
0.0% of 304 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Jul 15, 2026
Ownership types recorded
none recorded
Median battery size
18.5 kWh (10 installs list a capacity)
First install
Aug 25, 2003
Latest install
Jul 15, 2026
Counties
13
Utilities
PGE 304
CSLB license
292491

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200310
200420
200550
200670
200750
200810
200990
201060
201150
201230
2013100
2014240
2015280
2016240
2017260
2018160
2019200
2020220
2021280
2022250
2023191
202442
2025107
2026 (through Aug 31, 2026)40

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 304 interconnected installs (5.3% of the 304 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013444.1%not counted
NEM 2.015450.7%1 (0.6%)
Net Billing Tariff165.3%9 (56.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Wing Solar & Wood Energy, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Wing Solar & Wood Energy, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of Wing Solar & Wood Energy, Inc.’s 16 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 56.3%) used modules recorded as JA Solar.

In the last 24 months, 16 of Wing Solar & Wood Energy, Inc.’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of Wing Solar & Wood Energy, Inc.’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Lithion Battery Inc..

3 of 10 battery-paired PG&E and SCE installs (30.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar9not in top list
Fortress Power LLC6not in top list
Qcells3not in top list
Silfab2not in top list
Canadian Solar1157
Inverter makerEnphase8251
Sol-Ark810
Fortress Power LLC1not in top list
Battery makerLithion Battery Inc.22
Fortress Power LLC11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 290 of 304 installs, inverters on 304. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Wing Solar & Wood Energy, Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 53 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Sep 25, 2023 to Oct 6, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved136$8,894
Cancelled118$2,668

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage136$8,8940$0
Small Residential Storage118$2,6680$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
292491WING SOLAR & WOOD ENERGY INC (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorMar 12, 1974Aug 31, 2027246

License numbers are the ones the utilities recorded on the interconnection applications (247 of 304 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 292491. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tehama203
Shasta40
Butte28
Glenn9
Sonoma6
Yolo4
Solano3
Sutter3
Colusa2
Napa2
Yuba2
Humboldt1
Lassen1

Top cities

CityInstalls
Red Bluff131
Corning41
Cottonwood25
Chico16
Los Molinos12
Orland9
Redding9
Anderson8
Gerber7
Oroville6
Santa Rosa5
Durham4
Woodland4
Shingletown3
Burney2

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WING SOLAR & WOOD ENERGY INC117
Wing Solar & Wood Energy, Inc.100
Wing Solar & Wood Energy45
Wing Solar & Wood Energy Inc.17
Wing Solar & Wood Energy, Inc15
Wing Solar & Wood Energy Inc3
WING SOLAR & WOOD ENERGY1
Wing Solar & Wood Energy inc1
wing solar & wood energy inc.1
Wing solar & Wood Energy, Inc1
WING SOLAR & WOOD ENERGY, INC1
WING SOLAR & WOOD ENERGY, INC.1
Wing Solar and Wood Energy1

Common questions

Where does Wing Solar & Wood Energy, Inc. install solar?

Its installs are spread across 13 counties. The most are in Tehama County (203 installs), followed by Shasta County (40).

How often does Wing Solar & Wood Energy, Inc. install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 56.3% in the last 24 months (9 of 16).

How many Wing Solar & Wood Energy, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 304 interconnected installs (5.3% of the 304 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.