Solar installers in Lassen County, California
Who installs the most solar in Lassen County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Lassen County are Hufft Solar inc (2), BRANCH JOE ELECTRIC INC (1) and Citadel Roofing and Solar (1). They account for 4 of the 15 residential solar installs interconnected there in that window.
In all, 93 homes in Lassen County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 10 of 10 installers with installs in this window. 4 installs in the window were self-installed or had no installer recorded.
| 1 | Hufft Solar inc | 2 | 3 |
| 2 | BRANCH JOE ELECTRIC INC | 1 | 1 |
| 3 | Citadel Roofing and Solar | 1 | 1 |
| 4 | FREEDOM FOREVER LLC | 1 | 1 |
| 5 | GREEN HOME SYSTEMS TX INC | 1 | 1 |
| 6 | NORTH STATE SOLAR ENERGY CONSTRUCTION | 1 | 1 |
| 7 | OHM SOLAR SOLUTIONS | 1 | 2 |
| 8 | SAMEDAY SOLUTIONS | 1 | 1 |
| 9 | Sol-Up | 1 | 1 |
| 10 | VELASCO'S ELECTRICAL | 1 | 1 |
Most installs, all time
| 1 | Electric Solar Solutions Inc. | 10 | 10 |
| 2 | Dave Moyer Solar | 7 | 7 |
| 3 | Sunworks | 6 | 6 |
| 4 | PowerHouse Solar | 5 | 5 |
| 5 | Top Hat Energy inc | 5 | 5 |
| 6 | Almanor Energy Plus, Inc. | 4 | 4 |
| 7 | ADDY SOLAR | 3 | 3 |
| 8 | Hufft Solar inc | 3 | 3 |
| 9 | California Power-Save | 2 | 2 |
| 10 | Delbert Howard's Building, Inc | 2 | 2 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 6 | 1 |
| 2023 | 9 | 0 |
| 2024 | 9 | 5 |
| 2025 | 6 | 2 |
| 2026 (through Aug 31, 2026) | 6 | 4 |
Under the Net Billing Tariff (NEM 3.0)
14 of the 93 residential solar installs in Lassen County (15.1% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.3% of those include battery storage. The latest was approved Aug 14, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Lassen County
| 1 | Hufft Solar inc | 3 | 3 | 100.0% |
| 2 | Citadel Roofing and Solar | 1 | 0 | 0.0% |
| 3 | FREEDOM FOREVER LLC | 1 | 1 | 100.0% |
| 4 | GREEN HOME SYSTEMS TX INC | 1 | 1 | 100.0% |
| 5 | NORTH STATE SOLAR ENERGY CONSTRUCTION | 1 | 0 | 0.0% |
| 6 | OHM SOLAR SOLUTIONS | 1 | 1 | 100.0% |
| 7 | Sol-Up | 1 | 1 | 100.0% |
| 8 | Tesla Energy Operations (formerly SolarCity) | 1 | 1 | 100.0% |
| 9 | VELASCO'S ELECTRICAL | 1 | 1 | 100.0% |
| 10 | Wing Solar & Wood Energy, Inc. | 1 | 0 | 0.0% |
Top 10, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Lassen County
| City | All-time installs |
|---|---|
| Mcarthur | 57 |
| Lake Almanor | 19 |
| Bieber | 8 |
| Westwood | 8 |
| Little Valley | 1 |
ZIP codes in Lassen County
ZIP codes with their own page where the utilities recorded Lassen County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 15 of Lassen County’s 15 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 26.7%) used modules recorded as Qcells.
In the last 24 months, 15 of Lassen County’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 73.3%) used inverters recorded as Enphase.
In the last 24 months, 7 of Lassen County’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 57.1%) used batteries recorded as Enphase.
11 of 12 battery-paired PG&E and SCE installs (91.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 4 | 22 |
| REC | 4 | 10 | |
| AMPS Solar | 1 | not in top list | |
| Elin Energy | 1 | not in top list | |
| JA Solar | 1 | not in top list | |
| Inverter maker | Enphase | 11 | 43 |
| Tesla | 3 | 4 | |
| APsystems (Altenergy Power System) | 1 | not in top list | |
| Lion Energy | 1 | not in top list | |
| SolarEdge | 1 | 15 | |
| Battery maker | Enphase | 4 | 7 |
| Tesla | 2 | 3 | |
| Lion Energy | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 89 of 93 installs, inverters on 93. See the methodology and the equipment index.
SGIP battery storage projects in Lassen County
The SGIP public project report downloaded Nov 16, 2026 lists 7 battery storage projects in Lassen County with the status Paid, carrying $86,895 in current incentive allocations and 135 kWh of storage. Across every status it lists 19 storage projects there, 1 of them cancelled and 11 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 7 | 135 | $86,895 |
| Reserved | 9 | 122 | $193,039 |
| Pending Reservation | 1 | 15 | $34,764 |
| Waitlist | 1 | 13 | $14,520 |
| Cancelled | 1 | 15 | $27,564 |
Installers named on the most SGIP storage projects in Lassen County
| Installer | Projects | Paid |
|---|---|---|
| HAVEN ENERGY SERVICES INC | 11 | 0 |
| LA Solar Group | 3 | 3 |
| Infinity Energy, Inc | 2 | 2 |
| Powur PBC (Powur Home) | 1 | 1 |
| SOLAR SAVINGS DIRECT INC | 1 | 1 |
1 of the 19 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Lassen County (EIA)
EIA’s 2025 Service Territory file lists 5 utilities serving Lassen County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Surprise Valley Electrification | Cooperative | 20 | 18 | 0.184 | AC | 0 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Lassen Municipal Utility District; Plumas-Sierra Rural Elec Coop; WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Lassen County
1 C-46 Solar license in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) lists Lassen County as the county: 1 with the business type Corporation, Limited Liability, Partnership or JointVenture and 0 Sole Owner. 0 C-10 Electrical licenses in Lassen County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Lassen County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 93
- Last 24 months
- 15
- Capacity
- 644.6 kW DC
- Median system size
- 6.4 kW DC
- With battery storage
- 12.9% all time; 53.3% last 24 months
- Third-party owned
- 3.2% where reported
- Ownership types recorded
- PPA 2, lease 1
- Median battery size
- 14 kWh
- Earliest install in data
- Apr 12, 2005
Common questions
How many homes in Lassen County have solar?
93 residential solar systems in Lassen County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 15 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Lassen County?
10 installer names have at least one install interconnected in Lassen County in the last 24 months, and 44 appear in the full record.
How common are batteries with new solar in Lassen County?
12.9% of the solar installs interconnected in Lassen County include battery storage across all years, and 53.3% in the last 24 months (8 of 15).
How many solar installs in Lassen County are under NEM 3.0?
14 of the 93 residential solar installs in Lassen County (15.1% of the 93 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 64.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.