ADDY SOLAR

How many solar installs has ADDY SOLAR done in California, and which license number is on its installs?

ADDY SOLAR has 148 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 29, 2019 to Jul 23, 2026), most of them in Shasta County (112), Tehama County (16) and Plumas County (5). CSLB lists license 972276 (ADDY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
148
Last 24 months
25
Total capacity
1,440.4 kW DC
Median system size
8.9 kW DC
With battery storage
20.9% all time; 68.0% last 24 months
Third-party owned
6.1% of 148 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Jul 23, 2026
Ownership types recorded
PPA 9
Median battery size
646 kWh (1 installs list a capacity)
First install
Oct 29, 2019
Latest install
Jul 23, 2026
Counties
11
Utilities
PGE 148
CSLB license
972276

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
2020270
2021181
2022232
2023375
2024158
2025128
2026 (through Aug 31, 2026)107

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 148 interconnected installs (23.0% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.6% of those include battery storage. The latest Net Billing Tariff install was approved Jul 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011477.0%7 (6.1%)
Net Billing Tariff3423.0%24 (70.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 9 of ADDY SOLAR’s installs the utility recorded a third-party ownership type: PPA 9, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ADDY SOLAR exactly.

Third-party owner named on its installsInstalls
SunPower7
Addy Solar and Electric1
EverBright1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of ADDY SOLAR’s 25 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 56.0%) used modules recorded as SunPower.

In the last 24 months, 25 of ADDY SOLAR’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 96.0%) used inverters recorded as Enphase.

In the last 24 months, 16 of ADDY SOLAR’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 56.3%) used batteries recorded as FranklinWH.

28 of 31 battery-paired PG&E and SCE installs (90.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower1441
Qcells49
Aptos Solar2not in top list
Sonali Energees USA LLC2not in top list
Waaree230
Inverter makerEnphase2492
FranklinWH99
Tesla4not in top list
SunPower220
SMA15
Battery makerFranklinWH99
Tesla44
Enphase22
SunPower113

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 135 of 148 installs, inverters on 148. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
972276ADDY SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 20, 2012Apr 30, 2027148

License numbers are the ones the utilities recorded on the interconnection applications (148 of 148 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 972276. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Shasta112
Tehama16
Plumas5
Santa Clara4
Lassen3
Contra Costa2
Glenn2
Alameda1
Humboldt1
Lake1
Trinity1

Top cities

CityInstalls
Redding41
Cottonwood24
Anderson20
Palo Cedro13
Red Bluff7
Shingletown5
Burney3
Fall River Mills3
Mcarthur3
Quincy3
Corning2
Igo2
Orland2
Shasta2
Bella Vista1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ADDY SOLAR148

Common questions

Where does ADDY SOLAR install solar?

Its installs are spread across 11 counties. The most are in Shasta County (112 installs), followed by Tehama County (16).

How often does ADDY SOLAR install batteries with solar?

20.9% of its interconnected solar installs include battery storage across all years, and 68.0% in the last 24 months (17 of 25).

How many ADDY SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 148 interconnected installs (23.0% of the 148 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.