Electric Solar Solutions Inc.

How many solar installs has Electric Solar Solutions Inc. done in California, and which license number is on its installs?

Electric Solar Solutions Inc. has 407 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Mar 25, 2016 to Aug 11, 2026), most of them in Shasta County (322), Tehama County (55) and Butte County (17). CSLB lists license 1008638 (ELECTRIC SOLAR SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
407
Last 24 months
51
Total capacity
3,204.7 kW DC
Median system size
7.7 kW DC
With battery storage
10.1% all time; 39.2% last 24 months
Third-party owned
0.0% of 407 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
56 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
First install
Mar 25, 2016
Latest install
Aug 11, 2026
Counties
6
Utilities
PGE 407
CSLB license
1008638

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016260
2017340
201820
201990
2020320
2021565
2022824
2023987
2024259
2025269
2026 (through Aug 31, 2026)177

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

56 of its 407 interconnected installs (13.8% of the 407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0276.6%not counted
NEM 2.032479.6%15 (4.6%)
Net Billing Tariff5613.8%26 (46.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Electric Solar Solutions Inc.’s installs. No residential system in the file lists a third-party owner name that matches Electric Solar Solutions Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of Electric Solar Solutions Inc.’s 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 34.7%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 51 of Electric Solar Solutions Inc.’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (49, 96.1%) used inverters recorded as Enphase.

In the last 24 months, 18 of Electric Solar Solutions Inc.’s 51 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (18, 100.0%) used batteries recorded as Enphase.

37 of 41 battery-paired PG&E and SCE installs (90.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)1721
Qcells1262
Mission Solar8226
LONGi66
Canadian Solar255
Inverter makerEnphase49405
EG422
Chilicon Power, LLC1not in top list
Battery makerEnphase1837

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 387 of 407 installs, inverters on 407. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Electric Solar Solutions Inc. as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 13 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 27, 2020 to Oct 27, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled113$12,940

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency113$12,9400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1008638ELECTRIC SOLAR SOLUTIONS INC (Corporation)CLEARC-10 Electrical ContractorNov 3, 2015Nov 30, 2027403

License numbers are the ones the utilities recorded on the interconnection applications (407 of 407 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1008638. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Shasta322
Tehama55
Butte17
Lassen10
Glenn2
Plumas1

Top cities

CityInstalls
Redding122
Anderson57
Cottonwood40
Palo Cedro31
Red Bluff29
Mcarthur17
Fall River Mills13
Shingletown13
Bella Vista11
Paradise11
Burney9
Millville7
Corning6
Shasta6
Oak Run5

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELECTRIC SOLAR SOLUTIONS INC314
Electric Solar Solutions Inc.46
Electric Solar Solutions37
Electric Solar Solutions Inc9
Electric Solar Solutions inc1

Common questions

Where does Electric Solar Solutions Inc. install solar?

Its installs are spread across 6 counties. The most are in Shasta County (322 installs), followed by Tehama County (55).

How often does Electric Solar Solutions Inc. install batteries with solar?

10.1% of its interconnected solar installs include battery storage across all years, and 39.2% in the last 24 months (20 of 51).

How many Electric Solar Solutions Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

56 of its 407 interconnected installs (13.8% of the 407 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.