Top Hat Energy inc

How many solar installs has Top Hat Energy inc done in California, and which license number is on its installs?

Top Hat Energy inc has 552 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Aug 3, 2007 to Aug 7, 2026), most of them in Shasta County (482), Tehama County (48) and Lassen County (5). CSLB lists license 530588 (TOP HAT ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, D-34, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
552
Last 24 months
35
Total capacity
6,092.2 kW DC
Median system size
10.3 kW DC
With battery storage
11.4% all time; 54.3% last 24 months
Third-party owned
0.2% of 552 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Aug 7, 2026
Ownership types recorded
lease 1
Median battery size
28.6 kWh (30 installs list a capacity)
First install
Aug 3, 2007
Latest install
Aug 7, 2026
Counties
15
Utilities
PGE 552
CSLB license
530588

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200720
200820
200990
201050
201110
2012110
2013180
2014290
2015410
2016410
2017300
2018470
2019490
2020330
20217123
20226213
2023424
2024307
2025219
2026 (through Aug 31, 2026)87

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 552 interconnected installs (7.8% of the 552 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 53.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.016229.3%not counted
NEM 2.034762.9%39 (11.2%)
Net Billing Tariff437.8%23 (53.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Top Hat Energy inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Top Hat Energy inc exactly.

Third-party owner named on its installsInstalls
Tyler Garrett1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of Top Hat Energy inc’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (27, 79.4%) used modules recorded as REC.

In the last 24 months, 35 of Top Hat Energy inc’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 65.7%) used inverters recorded as Sol-Ark.

In the last 24 months, none of Top Hat Energy inc’s 35 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

15 of 63 battery-paired PG&E and SCE installs (23.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC27348
EG41821
Qcells538
BP Solar1not in top list
JinkoSolar1not in top list
Inverter makerSol-Ark2342
Enphase1033
SMA258
EG41not in top list
SolarEdge1305
Battery makerLG014
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 501 of 552 installs, inverters on 552. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Top Hat Energy inc as developer on 71 battery storage projects and as installer on 64 (64 name it as both), 71 projects in all with 1,305 kWh of storage. 38 have the status Paid, with $529,626 in current incentive allocations. Applications were received from Apr 18, 2019 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid38612$529,626
Reserved3166$83,394
Cancelled29508$469,387
RRF Rejected119$2,881

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency551,106$984,55729$505,423
Small Residential Storage12128$31,3389$24,203
Residential Solar and Storage Equity - AB 209 Non-POU228$62,2430$0
Large-Scale Storage124$4,2690$0
Not stated119$2,8810$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
530588TOP HAT ENERGY INC (Corporation)CLEARC-10 Electrical Contractor; D-34May 19, 1988Jul 31, 2028480

License numbers are the ones the utilities recorded on the interconnection applications (480 of 552 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 530588. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Shasta482
Tehama48
Lassen5
Butte3
Glenn3
Yolo2
Lake1
Napa1
Plumas1
San Joaquin1
Santa Clara1
Solano1
Sonoma1
Sutter1
Yuba1

Top cities

CityInstalls
Redding190
Palo Cedro103
Cottonwood42
Anderson41
Millville30
Red Bluff26
Shingletown18
Bella Vista17
Fall River Mills9
Mcarthur9
Oak Run8
Whitmore7
Corning6
Round Mountain6
Shasta6

Names as recorded by the utilities

The utilities recorded this installer under 14 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TOP HAT ENERGY INC273
Top Hat Energy inc175
Top Hat Energy34
Top Hat Energy Inc33
top hat energy16
Top Hat Energy Inc.12
Top Hat energy2
TOP HAT energy1
TOP HAT ENERGY1
Top hat Energy Inc.1
Top Hat Energy inc.1
Top Hat Energy, Inc1
Top hat Energy, Inc.1
Top Hat Energy, Inc.1

Common questions

Where does Top Hat Energy inc install solar?

Its installs are spread across 15 counties. The most are in Shasta County (482 installs), followed by Tehama County (48).

How often does Top Hat Energy inc install batteries with solar?

11.4% of its interconnected solar installs include battery storage across all years, and 54.3% in the last 24 months (19 of 35).

How many Top Hat Energy inc installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 552 interconnected installs (7.8% of the 552 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 53.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.