HAMMOND JIM ELECTRIC INC

How many solar installs has HAMMOND JIM ELECTRIC INC done in California, and which license number is on its installs?

HAMMOND JIM ELECTRIC INC has 378 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 7, 2019 to Aug 28, 2026), most of them in Sutter County (268), Yuba County (67) and Nevada County (24). CSLB lists license 1017611 (HAMMOND JIM ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
378
Last 24 months
50
Total capacity
3,368.6 kW DC
Median system size
8.4 kW DC
With battery storage
13.8% all time; 50.0% last 24 months
Third-party owned
0.0% of 378 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
39 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
61.4 kWh (2 installs list a capacity)
First install
Oct 7, 2019
Latest install
Aug 28, 2026
Counties
6
Utilities
PGE 378
CSLB license
1017611

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201970
2020350
2021551
20228110
20231236
20243917
20252610
2026 (through Aug 31, 2026)128

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

39 of its 378 interconnected installs (10.3% of the 378 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.033989.7%22 (6.5%)
Net Billing Tariff3910.3%30 (76.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HAMMOND JIM ELECTRIC INC’s installs. No residential system in the file lists a third-party owner name that matches HAMMOND JIM ELECTRIC INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of HAMMOND JIM ELECTRIC INC’s 50 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 79.6%) used modules recorded as REC.

In the last 24 months, 50 of HAMMOND JIM ELECTRIC INC’s 50 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (48, 96.0%) used inverters recorded as Enphase.

In the last 24 months, 23 of HAMMOND JIM ELECTRIC INC’s 50 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 100.0%) used batteries recorded as Enphase.

48 of 52 battery-paired PG&E and SCE installs (92.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC39184
JA Solar5not in top list
JinkoSolar4not in top list
Qcells118
Storz Power1not in top list
Inverter makerEnphase48375
Sol-Ark14
SolarEdge1not in top list
Battery makerEnphase2348

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 360 of 378 installs, inverters on 378. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1017611HAMMOND JIM ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorAug 25, 2016Aug 31, 2028375

License numbers are the ones the utilities recorded on the interconnection applications (375 of 378 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1017611. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Sutter268
Yuba67
Nevada24
Butte11
Colusa4
Placer4

Top cities

CityInstalls
Yuba City212
Marysville38
Sutter26
Live Oak25
Grass Valley22
Browns Valley9
Plumas Lake9
Gridley6
Olivehurst6
Colusa3
Oregon House3
Auburn2
Linda2
Loomis2
Meridian2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HAMMOND JIM ELECTRIC INC378

Common questions

Where does HAMMOND JIM ELECTRIC INC install solar?

Its installs are spread across 6 counties. The most are in Sutter County (268 installs), followed by Yuba County (67).

How often does HAMMOND JIM ELECTRIC INC install batteries with solar?

13.8% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (25 of 50).

How many HAMMOND JIM ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

39 of its 378 interconnected installs (10.3% of the 378 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.