Sierra Solar Inc.

How many solar installs has Sierra Solar Inc. done in California, and which license number is on its installs?

Sierra Solar Inc. has 197 residential solar installs interconnected in California, active in the records from 2002 through 2025 (Feb 14, 2002 to May 22, 2025), most of them in Inyo County (112), Mono County (79) and Nevada County (2). CSLB lists license 360454 (SIERRA SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
197
Last 24 months
12
Total capacity
1,201.8 kW DC
Median system size
5.7 kW DC
With battery storage
8.6% all time; 75.0% last 24 months
Third-party owned
0.0% of 157 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest May 22, 2025
Ownership types recorded
none recorded
Median battery size
10.1 kWh (17 installs list a capacity)
First install
Feb 14, 2002
Latest install
May 22, 2025
Counties
6
Utilities
SCE 191, PGE 6
CSLB license
360454

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200230
200300
200430
200520
200640
200750
200830
200900
201010
201140
201260
201390
2014220
2015160
2016120
2017140
2018120
2019170
2020180
2021132
202282
202394
2024104
202565
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 197 interconnected installs (6.6% of the 197 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The latest Net Billing Tariff install was approved May 22, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09548.2%not counted
NEM 2.08945.2%7 (7.9%)
Net Billing Tariff136.6%10 (76.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sierra Solar Inc.’s installs. Across all installers, 3 residential systems list a third-party owner name that matches Sierra Solar Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of Sierra Solar Inc.’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 58.3%) used modules recorded as Canadian Solar.

In the last 24 months, 12 of Sierra Solar Inc.’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 83.3%) used inverters recorded as Enphase.

In the last 24 months, 9 of Sierra Solar Inc.’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 77.8%) used batteries recorded as Enphase.

16 of 17 battery-paired PG&E and SCE installs (94.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar715
REC245
Hyundai1not in top list
JinkoSolar1not in top list
Trina Solar1not in top list
Inverter makerEnphase10122
EG42not in top list
Battery makerEnphase714
Tesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 130 of 197 installs, inverters on 197. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sierra Solar Inc. as developer on 3 battery storage projects and as installer on 3 (3 name it as both), 3 projects in all with 49 kWh of storage. 3 have the status Paid, with $40,765 in current incentive allocations. Applications were received from Mar 15, 2021 to Apr 29, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid349$40,765

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency239$38,8242$38,824
Small Residential Storage110$1,9411$1,941

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
360454SIERRA SOLAR INC (Corporation)CLEAR, WC Susp PendingB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJul 11, 1978Dec 31, 2026189

License numbers are the ones the utilities recorded on the interconnection applications (193 of 197 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 360454. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Inyo112
Mono79
Nevada2
Placer2
Calaveras1
Yuba1

Top cities

CityInstalls
Bishop114
Crowley Lake26
Mammoth Lakes19
Lee Vining15
Swall Meadows9
Bridgeport4
Benton2
June Lake2
Auburn1
Browns Valley1
Grass Valley1
Nevada City1
Roseville1
Valley Springs1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SIERRA SOLAR INC70
SIERRA SOLAR55
Sierra Solar Inc.49
SIERRA SOLAR INC.11
Sierra Solar9
Sierra Solar inc.2
Sierra solar Inc.1

Common questions

Where does Sierra Solar Inc. install solar?

Its installs are spread across 6 counties. The most are in Inyo County (112 installs), followed by Mono County (79).

How often does Sierra Solar Inc. install batteries with solar?

8.6% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (9 of 12).

How many Sierra Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 197 interconnected installs (6.6% of the 197 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.