HIGH POINT SOLAR

How many solar installs has HIGH POINT SOLAR done in California, and which license number is on its installs?

HIGH POINT SOLAR has 134 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Aug 31, 2017 to May 26, 2026), most of them in Inyo County (89), Mono County (44) and Los Angeles County (1). CSLB lists license 907086 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
134
Last 24 months
29
Total capacity
811.7 kW DC
Median system size
5.8 kW DC
With battery storage
23.1% all time; 69.0% last 24 months
Third-party owned
0.0% of 134 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest May 26, 2026
Ownership types recorded
none recorded
Median battery size
14.3 kWh (31 installs list a capacity)
First install
Aug 31, 2017
Latest install
May 26, 2026
Counties
3
Utilities
SCE 134
CSLB license
907086

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201790
201840
201920
2020183
2021161
2022261
2023212
2024158
20251711
2026 (through Aug 31, 2026)65

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 134 interconnected installs (24.6% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.8% of those include battery storage. The latest Net Billing Tariff install was approved May 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010175.4%6 (5.9%)
Net Billing Tariff3324.6%25 (75.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HIGH POINT SOLAR’s installs. No residential system in the file lists a third-party owner name that matches HIGH POINT SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 29 of HIGH POINT SOLAR’s 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 82.8%) used modules recorded as REC.

In the last 24 months, 29 of HIGH POINT SOLAR’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 19 of HIGH POINT SOLAR’s 29 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (19, 100.0%) used batteries recorded as Enphase.

26 of 31 battery-paired PG&E and SCE installs (83.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC2495
JA Solar55
EG41not in top list
Inverter makerEnphase2981
Battery makerEnphase1925

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 127 of 134 installs, inverters on 134. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
907086Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 27, 2007Nov 30, 2027134

License numbers are the ones the utilities recorded on the interconnection applications (134 of 134 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 907086. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Inyo89
Mono44
Los Angeles1

Top cities

CityInstalls
Bishop86
Crowley Lake18
Mammoth Lakes11
Benton10
Big Pine3
Lee Vining3
Bridgeport2
Pasadena1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HIGH POINT SOLAR134

Common questions

Where does HIGH POINT SOLAR install solar?

Its installs are spread across 3 counties. The most are in Inyo County (89 installs), followed by Mono County (44).

How often does HIGH POINT SOLAR install batteries with solar?

23.1% of its interconnected solar installs include battery storage across all years, and 69.0% in the last 24 months (20 of 29).

How many HIGH POINT SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 134 interconnected installs (24.6% of the 134 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.