HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION
How many solar installs has HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION done in California, and which license number is on its installs?
HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION has 608 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 9, 2019 to Aug 3, 2026), most of them in Santa Clara County (493), San Mateo County (71) and Alameda County (40). CSLB lists license 960376 (HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 608
- Last 24 months
- 89
- Total capacity
- 3,924.8 kW DC
- Median system size
- 6 kW DC
- With battery storage
- 15.5% all time; 65.2% last 24 months
- Third-party owned
- 0.0% of 608 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 88 installs, latest Aug 3, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 12.6 kWh (14 installs list a capacity)
- First install
- Oct 9, 2019
- Latest install
- Aug 3, 2026
- Counties
- 5
- Utilities
- PGE 608
- CSLB license
- 960376
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2019 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2019 | 39 | 0 |
| 2020 | 90 | 0 |
| 2021 | 102 | 5 |
| 2022 | 106 | 16 |
| 2023 | 142 | 6 |
| 2024 | 54 | 14 |
| 2025 | 54 | 34 |
| 2026 (through Aug 31, 2026) | 21 | 19 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
88 of its 608 interconnected installs (14.5% of the 608 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 520 | 85.5% | 36 (6.9%) |
| Net Billing Tariff | 88 | 14.5% | 58 (65.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION’s installs. No residential system in the file lists a third-party owner name that matches HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 87 of HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION’s 89 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (32, 36.8%) used modules recorded as Qcells.
In the last 24 months, 89 of HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION’s 89 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (70, 78.7%) used inverters recorded as Enphase.
In the last 24 months, 55 of HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION’s 89 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 50.9%) used batteries recorded as Tesla.
71 of 94 battery-paired PG&E and SCE installs (75.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 32 | 188 |
| REC | 26 | 67 | |
| Hyundai | 25 | 25 | |
| LG | 3 | 265 | |
| Panasonic | 3 | 32 | |
| Inverter maker | Enphase | 70 | 572 |
| Tesla | 28 | 29 | |
| FranklinWH | 16 | 19 | |
| LG | 2 | not in top list | |
| Fronius | 1 | not in top list | |
| Battery maker | Tesla | 28 | 28 |
| FranklinWH | 15 | 17 | |
| Enphase | 11 | 16 | |
| GoodWe Technologies Co., Ltd. | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 580 of 608 installs, inverters on 608. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 960376 | HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor | Apr 27, 2011 | Apr 30, 2027 | 608 |
License numbers are the ones the utilities recorded on the interconnection applications (608 of 608 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 960376. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Highlight Solar, Inc.: 566 installs, license 960376
Counties
| County | Installs |
|---|---|
| Santa Clara | 493 |
| San Mateo | 71 |
| Alameda | 40 |
| Santa Cruz | 3 |
| Contra Costa | 1 |
Top cities
| City | Installs |
|---|---|
| San Jose | 253 |
| Sunnyvale | 46 |
| Los Altos | 45 |
| Cupertino | 38 |
| Campbell | 26 |
| Fremont | 24 |
| Mountain View | 20 |
| Saratoga | 20 |
| Los Gatos | 16 |
| Menlo Park | 11 |
| Milpitas | 11 |
| Redwood City | 11 |
| San Mateo | 11 |
| Belmont | 10 |
| San Carlos | 10 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION | 607 |
| Highlight Solar Inc A California Corporation | 1 |
Common questions
Where does HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION install solar?
Its installs are spread across 5 counties. The most are in Santa Clara County (493 installs), followed by San Mateo County (71).
How often does HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION install batteries with solar?
15.5% of its interconnected solar installs include battery storage across all years, and 65.2% in the last 24 months (58 of 89).
How many HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION installs are under NEM 3.0 (the Net Billing Tariff)?
88 of its 608 interconnected installs (14.5% of the 608 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.