Highlight Solar, Inc.

How many solar installs has Highlight Solar, Inc. done in California, and which license number is on its installs?

Highlight Solar, Inc. has 566 residential solar installs interconnected in California, active in the records from 2012 through 2021 (Jun 22, 2012 to Apr 1, 2021), most of them in Santa Clara County (465), San Mateo County (63) and Alameda County (33). CSLB lists license 960376 (HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
566
Last 24 months
0
Total capacity
2,957.6 kW DC
Median system size
4.8 kW DC
With battery storage
0.2% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 566 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 22, 2012
Latest install
Apr 1, 2021
Counties
6
Utilities
PGE 566
CSLB license
960376

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
2013230
2014510
2015990
20161320
20171020
2018770
2019791
202000
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 566 interconnected installs with a tariff recorded (566) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030854.4%not counted
NEM 2.025845.6%1 (0.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Highlight Solar, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Highlight Solar, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 563 of Highlight Solar, Inc.’s 566 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (272, 48.3%) used modules recorded as LG.

Across all years, 566 of Highlight Solar, Inc.’s 566 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (396, 70.0%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0272
SolarWorld0103
Canadian Solar068
Qcells055
SunPower031
Inverter makerEnphase0396
SolarEdge0143
SunPower025
Fronius01
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 563 of 566 installs, inverters on 566. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Highlight Solar, Inc. as developer on 10 battery storage projects and as installer on 7 (7 name it as both), 10 projects in all with 229 kWh of storage. 3 have the status Paid, with $24,499 in current incentive allocations. Applications were received from Nov 19, 2018 to Mar 24, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid357$24,499
Reserved382$23,916
Cancelled489$36,119

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage6122$18,0542$6,019
Equity Resiliency380$59,8801$18,480
Large-Scale Storage126$6,6000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
960376HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorApr 27, 2011Apr 30, 2027485

License numbers are the ones the utilities recorded on the interconnection applications (487 of 566 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 960376. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara465
San Mateo63
Alameda33
Contra Costa3
San Benito1
Santa Cruz1

Top cities

CityInstalls
San Jose248
Sunnyvale46
Cupertino34
Los Gatos24
Saratoga24
Fremont21
Campbell18
Los Altos15
Morgan Hill14
Milpitas13
Gilroy12
Mountain View12
Menlo Park10
Redwood City10
San Mateo10

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Highlight Solar, Inc.535
Highlight Solar22
Highlight Solar, Inc3
Highlight Solar Inc2
Highlight Solar,2
HIGHLIGHT SOLAR, INC1
HIGHLIGHT SOLAR, INC.1

Common questions

Where does Highlight Solar, Inc. install solar?

Its installs are spread across 6 counties. The most are in Santa Clara County (465 installs), followed by San Mateo County (63).

How often does Highlight Solar, Inc. install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years.

How many Highlight Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 566 interconnected installs with a tariff recorded (566) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.