PREMO & TORRES SOLAR ELECTRIC JV

How many solar installs has PREMO & TORRES SOLAR ELECTRIC JV done in California, and which license number is on its installs?

PREMO & TORRES SOLAR ELECTRIC JV has 105 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Oct 24, 2023 to Aug 31, 2026), most of them in Monterey County (93), Santa Cruz County (6) and San Benito County (5). CSLB lists license 1102949 (PREMO & TORRES SOLAR ELECTRIC JV) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
105
Last 24 months
78
Total capacity
634.4 kW DC
Median system size
5.7 kW DC
With battery storage
80.0% all time; 79.5% last 24 months
Third-party owned
0.0% of 105 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
97 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Oct 24, 2023
Latest install
Aug 31, 2026
Counties
4
Utilities
PGE 105
CSLB license
1102949

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202321
20243632
20253927
2026 (through Aug 31, 2026)2824

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

97 of its 105 interconnected installs (92.4% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.087.6%4 (50.0%)
Net Billing Tariff9792.4%80 (82.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PREMO & TORRES SOLAR ELECTRIC JV’s installs. No residential system in the file lists a third-party owner name that matches PREMO & TORRES SOLAR ELECTRIC JV exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 77 of PREMO & TORRES SOLAR ELECTRIC JV’s 78 installs name a module maker in the “Generator Manufacturer” fields, and most of those (69, 89.6%) used modules recorded as REC.

In the last 24 months, 78 of PREMO & TORRES SOLAR ELECTRIC JV’s 78 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (73, 93.6%) used inverters recorded as Enphase.

In the last 24 months, 60 of PREMO & TORRES SOLAR ELECTRIC JV’s 78 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (31, 51.7%) used batteries recorded as Enphase.

79 of 84 battery-paired PG&E and SCE installs (94.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC6990
SunPower34
LG24
Hyundai11
LONGi1not in top list
Inverter makerEnphase73100
FranklinWH1619
Tesla1414
SunPower22
Fronius11
Battery makerEnphase3149
FranklinWH1618
Tesla1313

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 102 of 105 installs, inverters on 105. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PREMO & TORRES SOLAR ELECTRIC JV as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 37 kWh of storage. 1 have the status Paid, with $1,456 in current incentive allocations. Applications were received from Dec 7, 2023 to Jan 23, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,456
Cancelled127$4,080

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage237$5,5361$1,456

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1102949PREMO & TORRES SOLAR ELECTRIC JV (JointVenture)CLEARC-10 Electrical ContractorMar 27, 2023Mar 31, 2027105

License numbers are the ones the utilities recorded on the interconnection applications (105 of 105 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1102949. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Monterey93
Santa Cruz6
San Benito5
Santa Clara1

Top cities

CityInstalls
Salinas21
Carmel17
Monterey15
Carmel Valley10
Pebble Beach8
Pacific Grove4
Hollister3
Marina3
Santa Cruz3
Seaside3
Aptos2
Aromas2
San Juan Bautista2
Soledad2
Watsonville2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PREMO & TORRES SOLAR ELECTRIC JV105

Common questions

Where does PREMO & TORRES SOLAR ELECTRIC JV install solar?

Its installs are spread across 4 counties. The most are in Monterey County (93 installs), followed by Santa Cruz County (6).

How often does PREMO & TORRES SOLAR ELECTRIC JV install batteries with solar?

80.0% of its interconnected solar installs include battery storage across all years, and 79.5% in the last 24 months (62 of 78).

How many PREMO & TORRES SOLAR ELECTRIC JV installs are under NEM 3.0 (the Net Billing Tariff)?

97 of its 105 interconnected installs (92.4% of the 105 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.